Laserfiche WebLink
' June 24, 1987 <br />hR. KEN BRUESTLE, BRIDGE ENGI�EER <br />BURLINGTON-NORTFERN RAILWAY <br />2000 FIRST INTERSTATE CENTER <br />999 THIRD AVENI� <br />SEATTLE, MA 98104-1105 <br />RE: HDWARTH PARK BRIDGE LUPLSTRUCTION <br />Dear Mr. Bruestle: <br />� <br />��r��od�D <br />JUN 2:' t9�7 <br />EVERETT BUILDING DEPT. <br />everett <br />the Evergreen <br />cma <br />everett <br />� PAR�SANDRCCRERIiON <br />UCC�pJMENI�-iORESTP�Re <br />159-0]OD <br />SL�H iPDLii�+.�J�C <br />M�iuNG �DDFE55 <br />JM11 WEIMORF <br />� EVERFTI W�BP]0+ <br />fie pedestrian bridge related to the above project is scheduled to arrive on <br />site TFwrsday, June 25, or Friday, June 26. The bridge will be installed over <br />the Burlington-Northern right-of-May on Monday, June 29, or Tuesday, June 30. <br />fiis is to request your inspection of the bridge on behalf of the railroad in <br />accordance with the �special railroad provisions' of the bid docunents. <br />Please contect Knut Olberg of JIJ Construction (Job shack, 258-2466 or <br />Femdele Office, 366-5050) or myself, (2:9-0300). <br />fiis letter constitutes 48 hours edvance notice. Thank you. <br />" ' Sirscerely, <br />����9�� <br />fieo Mittet, Park Coordinator <br />Everett Parks and Recreation <br />267d/co <br />cc: F3ob Garner, Lee Johnson Consultants <br />Knut Olberg, JIJ Construction (Job Shack) <br />Deryl Olson, JIJ Construction (Ferndale) <br />Qwck lundoren, Burlington-Northern Railway (Seattle) <br />�Sc tt Kipperberg, Burlington-Northern Railway (Everett) <br />Edwards, Plen Inspector, Bui.lding Department <br />Lerry Callahan, Building Official, Building DeFartment <br />Bob Cooper, Director Parks and Recreation <br />Jim Shields, Assistant Park Director <br />Reference: June 9 Corresponderice <br />�[�C�C��d�D <br />L� <br />��r� z; 1gg7 <br />CITY OF E�ERETTµ� <br />Putr'ic Works Dept. <br />