Laserfiche WebLink
i <br />PUBLIC WORKS <br />PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425To'06STING SEP 1 0 2005 <br />I APPLICANT NAME <br />ODE LTD AND ADDRESS. C UNEF. <br />PO BOX 61 <br />MUKILTEO WA, 98275 <br />Date 02/04/2005 <br />Public Works Permit Npp0502-012 <br />Building Permit # C0502-009 <br />Planning Reference N <br />Public Works Fee S $25 .00 <br />Guarantee S <br />PHONE: 2063009758 PHONE: <br />TAX PARCEL I.D.n PROJECTADDRESS: <br />29043600100400 307 OLYMPIC BLVD <br />PROPOSED WOMNEW HOUSE BASIC 127 <br />PERMIT CONDITIONS SHORT PLAT 1202-25-02, LOT 5 <br />1. All calls for inspection shall be made 24 hours in advance -phone (425) 257-8810 <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555 <br />4. Connect side sewer per City Standard N601. <br />5. Connect rooftop downspouts to the drainage system provided for this lot. <br />6. Install erosion control measures as determined by the Public works inspector, such <br />as silt fence, straw bales, swales, or erosion blankets. <br />7. Pave driveway from the front property line out to the street paving. <br />��lgf�/� 211d05 <br />`Approved for Consimcwn ate <br />1 <br />FINAL INSPECTION <br />Approved as Constructed - Date <br />`W` <br />Z <br />0 <br />U FE V+ <br />FEB 2 5 2005 D 0 <br />a <br />CITY e n if N� cesTC <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the Gty of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement or <br />other right-of-way use hereto applied for and further agrees to <br />remove same upon rom th it nd to replace public <br />property dart age ! <br />1 1 roJ-. <br />Sign ture of A pll ant Dal <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />