My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4105 OLYMPIC BLVD 2018-01-02 MF Import
>
Address Records
>
OLYMPIC BLVD
>
4105
>
4105 OLYMPIC BLVD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2022 10:41:14 AM
Creation date
2/25/2017 2:50:44 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
4105
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />/ a/ Connect side sewer per City Standard #601. <br />Connect side sewer per City Standard #'s 601, 602. 604 <br />6. Connect all rooftop downspouts to the side sewer. <br />7. Connect rooftop downspouts to the drainage system provided for this lot. <br />8 Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br />Manual 3-2 6 2 The approximate size trench is 3.5' wide, 2' deep and 25' long See attachment for <br />more details <br />9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br />beginning the project. Call Randy Allen at 425-339-7403 // Call Cliff Lindman at 425-339-7404. <br />��l Install erosion control measures as 'e'ermined by the Public Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets. <br />U�. Install erosion control measures per City of Everett Standards Tor small parcels <br />iRemove erosion control measures upon completion of the project prior to final approval of the permit <br />13 All excavated material from foundation, sidewelk and driveways shall be hauled to an approved, permitted <br />site. No wasting of material is allowed on this building lot. <br />10 <br />No dirt, mud, rocks or debris to be tracked onto roadway <br />15. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br />open for pedestrian travel. <br />16 Adjust water meter box 1" above sidewalk grace <br />17 Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on <br />this proposal's frontage as directed by the Public Works Inspector (i e. all unused driveways and any <br />broken or damaged area must be replaced). <br />18. Install a Type I concrete driveway per City of Everett Standard #307, <br />19. Pave driveway from the front property line out to the street paving <br />20, Pave to existing paving in alley <br />21 Contact the — - _ _ - Water District for connecting provisions for this building's water and <br />sewer services <br />22. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area <br />23 If a sewer pump system is to be installed, the pressure line must discharge into a prik ate manhole, then <br />gravity flow across the public right-of-way. <br />24 A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br />13D <br />Your Public Works Inspector is Cliff Lndman. Call him at 425-339-7404 for questions and inspections <br />PWComments / Revised 618111 r� f <br />
The URL can be used to link to this page
Your browser does not support the video tag.