My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4105 OLYMPIC BLVD 2018-01-02 MF Import
>
Address Records
>
OLYMPIC BLVD
>
4105
>
4105 OLYMPIC BLVD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2022 10:41:14 AM
Creation date
2/25/2017 2:50:44 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC BLVD
Street Number
4105
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br />Date 3197 Permit: C, 1.307— 00C� <br />Contractor: - <br />Owner: <br />Site Address:_ <br />TYPE OF INSPECTIO REQUE TED <br />ELECTRICAL <br />BUILDING <br />MECHANICAL <br />PLUMBING <br />❑Temp Service <br />❑LIFER ground <br />❑Groundwork/Slab <br />❑ Groundwork/Slab <br />❑ Groundwork <br />❑ Footing <br />❑ Rough In <br />n Rough In <br />❑ Slab/Conduit <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ Gelling Grid <br />❑ Rough In <br />❑ Structural Slab <br />❑ OK to insulate <br />❑ OK to insulate <br />❑ Seance <br />❑ Framing <br />11 Rpoltop Units <br />LJ Water Service <br />❑ Grounding <br />❑ Insulation <br />echanleal Final <br />❑ Medical Gas <br />Ceiling Grid <br />❑ Drywall Nailing <br />❑ Plumbing Final <br />Electrical Final <br />❑ Shear Nailing <br />GAS PIPE <br />SITE WORK <br />❑ Roof Nailing <br />❑ Rough In/Service <br />Hot Water Tank <br />n Footing drains <br />❑ Ceiling Grid <br />❑ Refrigeration <br />❑ Rough in <br />Roof drains <br />❑ Building Final <br />❑ Gas Pipe Final <br />❑ HWT Final <br />OTHER OR CONSULTATION: <br />PPROVAL ❑ PACO FINALAPPHOVALTHISPE <br />FOR T.C.O. ❑ CORRECTION REQUESTED <br />❑ OK FOR C.O. n VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: <br />❑ CALL (425) 257-BB81 FOR REINSPECTION — 24 hour notice required <br />Inspector: Date: ,/pL��j__ <br />1 In rrA,no) LWAeNI. INL <br />
The URL can be used to link to this page
Your browser does not support the video tag.