Laserfiche WebLink
Date(s) of work: <br />EXCAVATION/TRENCHING SAFETY CHECKLIST <br />� — 3 ' I'�S Work order <br />Location of work: S� <br />Is a"Competent Person", as defined in WAC 296-155-650, in chazge of job? <br />Has Dial-A-Dig been called?... <br />Dial-A-Dig number <br />Are traffic control devices in place? <br />................................. <br />Date & Time Dial-A-Dig <br />� <br />........... Yes �No � <br />............. Yes�No ❑ <br />Yes � No � <br />Is trench/evacuation on the toe of a hill, slope, or neaz a retaining wall? .......................... ........ Yes 0 No� <br />(If yes, consult supervisor or engincer for recommendations.) <br />If trench/excavation is less than 4 feet deep aze sides stable? ..................................................... Yes �No ❑ <br />(If not, then trench/excavation must be shored.) <br />If hench is more than 4 feet deep is shoring in use? ........................... ........1.....� ..................... Yes ❑ No ❑ <br />Is shoring rated for depth of trench/excavation? ................. ... .... ...... ..... ................... Yes � No ❑ <br />Is tabulated data for the shoring on the job site? ............... .................1......................... Yes � No ❑ <br />Are spoil piles and other material stored at lease 2 feet from the edge of the ........................... YeS��No � <br />trench/excavation? <br />Is water removed from the bottom of the trench/excavation? ....................................... <br />Is a ladder available for entry/exit from trench/excavation? ................................... :i............ <br />Does it extend 3 feet above top of trench? .............................................�••;`•�•• <br />Is it secnred at the to � �•i�l•••••••••••••••• <br />p .......................................................................... .... <br />Has it been ins ected for defects/ roblems toda � " <br />p p y . ......................................................... <br />Is there a means of communication with rescuers in the event of an accidenUproblem?........... <br />.� Are the open sides of the trench/excavation barricaded, or protected, to prevent falls? <br />_� ' ■ <br />Yes ❑ No ❑ <br />Yes � No � <br />Yes � No � <br />Yes � No ❑ <br />Yes,�}�No ❑ <br />Yes�No ❑ <br />Is there is a possibility of hazardous atmospheres in the trench/excavation? ............................. Yes [] No j�, <br />(Such as from leaking gas mains, nearby industries, work over landfills, or other situations.) <br />If yes, is a calibrated gas detector in use? ..................................................�.... /... Yes � No � <br />If yes, is a means of retrieval available for workers in the trench/excava�iol�?�.�...... Yes � No ❑ <br />Are all workers on site awaze of, afety re ments for workers in trenches/excavations? ..... Yes � No ❑ <br />(t�l, t�,�� C�'L- Date: �^3 —��ZJ <br />Signature of Crew Leader. — <br />ron.�is numicnuuidurvs> <br />