Laserfiche WebLink
W 00-P-6 7 INSPECTION REPORT <br />Address — —_ _[o_S_ r t, (— <br />_ <br />Contractor__— <br />Owner --- __ __ "_ <br />Date ---- ---2-A--5>_ <br />J APPROVAL J P3PTIAL APPROVAL <br />J VIOLATION &CORRECTION REQUESTED <br />Korrections listed below MUST BE MADE before work can be approved. <br />J Please contact inspector and arrange for appointment. <br />AJ W s not able to perform inspection. <br />LL 259-8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector /' 7/2:), Date_ <br />TYPE OF INSPECTION REQUESTED <br />J Temp. Elect. <br />J Fooling <br />❑ Framin <br />❑ DrywalP Nailing <br />J Gas Piping <br />J Consultation <br />J Foundation <br />❑ Shear Nailing <br />Ll Groundwork <br />J Ductwork <br />❑ Grid <br />4Struct. Slab <br />J Wood Stove <br />❑ Rough -in <br />AkFinal <br />J Masonry <br />❑ Service <br />❑ Insulation <br />❑ Other <br />J BLDG: Pmt. No. _ I ❑ MECH: Pmt. No._ _ <br />kl-EC: Pmt. No.-33,C?� q—J PLBG: Pmt. No. <br />