Laserfiche WebLink
Date' GCI <br />Application L&I <br />PUBLIC WOR PERMIT <br />Print or Type Only g p�gpo <br />Re N <br />M M <br />r. <br />Owner Mailing Odix tyz�� <br />u as <br />Mailing Address <br />Describe Proposed Work 1, [-'a--, �)LI)e'vL __ <br />Project Address fit known) <br />t/ <br />Public Works Perid,lf' '4ZZ <br />BIOS Dept a � <br />Public Works Fee <br />Total Fee $ <br />Less Appl. Fee PaN $ <br />Balance Due $ <br />Zip Phone <br />Cod <br />AZT %L�'M �=lL. Dt? <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />LI <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance - phone 259.8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424.5555. <br />Approved for Cnn `•lion Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />everelt PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />Phone: 259.8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />n <br />7 <br />U) <br />Im <br />O <br />n <br />z <br />O <br />U) <br />O <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses. or causes of action that may arise because of installation <br />and maintenance of the improvement or o!her right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />FSignahfre`of Apo cdnt - " Date <br />WORK AUTfi IZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />