Laserfiche WebLink
i <br /> everett IN�SP'ECTION REPORT <br /> eAddress �Q.�L-W�v11�J/�.�1-- <br /> Contractor _ ��u�� 7�.1 � ���_ <br /> Gwner � L �p�/ <br /> Date _ (p ' a6=�-G� <br /> TYPE OF INSPECTION REQUESTED <br /> ❑ BLDG: Pmt. No. ❑ MECH: PmL No. <br /> �l FLEC: PmL Na 1�PLBG: PmL No. ��ST�� <br /> ❑ Temp. Elect. ❑ Framing ❑Gas Piping <br /> ❑ Footing ❑ Drywall, Nailing ❑Consultation <br /> ❑ Foundation G Shear Nailing ❑ Groundwork <br /> ❑ Ductwork ❑ Grid ❑ Struct. Slab <br /> ❑Wood Stove p Rough•In '�Final <br /> ❑ Maso ❑ Service ❑ <br /> APPROVAL ❑ PARTIAL APPROVAL <br /> LA ❑ CORRECTION REQUIRED <br /> ❑ Corrections listed below MUST BE MADE before work can be app�oved. <br /> ❑ Please contact inspector and arrange lor appointment. <br /> ❑ Was not able to peAorm inspection. <br /> ❑CALL 259-8810 FOR REINSPECTION —24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE IS:.UED AND POSTED ON <br /> i THE PREMISES PRIOR TO OCCUPANCY. <br /> �"�� {'daLl�� �UWd � G`'.a <br /> In=necto� �iC/Qti� /� Date Z� <br />