Laserfiche WebLink
, � <br /> CIASED CM WORK ORDERS REPORT <br /> Tokal Utility Maintenance Manaqement System <br /> 04/19/1994 Page 1 <br /> as��sssavaseaszxaaaxavsva�s�v�vmv�v�svvvevaeesaea=eesava==caaaxaavvc=�¢asazxe��� <br /> Date Range :04/01/1992 - 04/15/1994 <br /> CM Work Order Ranqe :<Blank> - 8405421080229 Pattern :7401196750833 <br /> Item Range :<Blank> - WW22o20001 Pattern :* <br /> Proqram ALL Function ALL Activity ALL � <br /> sasazsvsaasaacsa�sassavz�axaevc�avsve=a:viceave-avsazazaa�:asssQasa:cv:s�as�asa <br /> CN WORK ORDER ID: 7301196750833 Title: AFTER HOURS 7102 OLYMPIC DR <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Itam ID: WS0785G008 -- WATER SERVICE <br /> Location ID: -- ' <br /> Proqram 740 Function 119 Activity 675 <br /> Data Completed: 04/11/1994 <br /> Ovarall Craft: <br /> Issued: 04/OB/1994 Issued by: SKL Assiqned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Readinq: <br /> Downtime: 0 hours <br /> Status: <br /> I.ebor: <br /> Craft ID Name Planned Hrs Actual Hre Cost <br /> -�--- ------ ------------------------------ ---•-------- ---------- ---------- <br /> UL IM11 LIBBING, MAURICE A. 0.00 1.00 13.68 <br /> WST MKC MOORE, KIM C. 0.00 2.00 39.46 <br /> UL NSO NIEISEN, SCOTT O. 0.00 1.00 14.35 •� <br /> WST NTM NEWELL, THOMAS M. 0.00 4.00 76.96 '��;' <br /> WST WDT WALDEN, DAROLD T. 0.00 3.00 54.96 '.; ? <br /> Total Labor Coet: 199.41 <br /> i Materials: <br /> ' ID Description Date M Used Cost <br /> ------------ -----�------------------------ -------- -------- ---------- <br /> � AW►P34000547 ADI�PTER 3/4" MIP X INSTA-TITE@ 04/13/1994 1 8.11 <br /> COUP34142847 COUPLING 3/4" CTN X 3/4" MIP @ 04/13/1994 1 2.97 <br /> � ELL03�139247 ELL 3/4° 45 DEG SLIP 04/13/1994 1 0.81 <br /> Total Material Coet: 31.89 <br /> Vehicles: <br /> ID Dnscription • Date Hours Cost <br /> -----__•----- ------------------------------ -------- ------ ---------- <br /> V0005 CHEV 3/4 TON 92 04/09/1994 4.00 23.20 <br /> V2117 CNEV 1 TON �91 04/09/1994 2.00 11.60 <br /> V2119 CHEV 5 TON 91 04/11/1994 1.00 10.40 <br /> V2146 SVC TRUCK CHEV 87 04/11/1994 1.00 5.20 <br /> V3505 BACKHOE CASE 82 04/09/1994 2.00 34.60 <br /> Total Vehicle Cost: 85.00 <br /> Total cost for work order 7401196^50833 : 296.30 <br />