Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT ' <br /> Total Utility Maintenance Managament System <br /> 04/19/1994 Paqe 1 <br /> saaavs�a:as:avsssan-eee-e=v=mec:ce��eaaamca=c=-vaca—vacee�sseazsa�vsaamasss�a= <br /> Date Range :04/OS/1992 - 04/15/1994 <br /> CM Work Order Ranqe :<Blunk> - 8405421080"29 Pattern :7401196750834 <br /> Item Range :<Blank> - WF122020001 Pattern :* <br /> Proqram ALL Function ALL Activity ALL <br /> asaasssszss:::�aa�aa�eevv=c===vss-�c=scc�av=caevcc=s�vexs¢a¢ame�vve�a�asa_aaaa <br /> CM WORK ORDER ID: 7401196750834 Title: REPAIR 7419 OLYl�PIC DR <br /> «LJPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS0785ICO28 -- WATER SERVICE <br /> Location ID: -- Activit 675 <br /> Proqram 740 Function 119 Y <br /> Date Completed: 04/11/1994 <br /> Overall Craft: <br /> Issued: 04/il/1994 Issued by: SKL Assiqned to: <br /> Out of Service? NO Priority: Trave2 Time: 0.00 Hr. <br /> Meter Readinq: <br /> Downtime: o hours <br /> Statu6: <br /> i <br /> Labor: � <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ - <br /> ---------- ---------- ---------- <br /> WST MKC MOORE, KIM C. 0.00 3.00 59.19 � <br /> UL MWE 1�[OORE, WARREN E. 0.00 1.00 14.35 � <br /> HEO SDD STECHER, DANIEL D. 0.00 1.00 18.66 ! <br /> WST SRJ STENSETH, ROBERT J. 0.00 3.00 ___-_58 77 � <br /> Total Labor Cost: 150.97 <br /> ; <br /> Materials: Date N Uaed Cost <br /> Ip Description __________ <br /> - -----�-�-- --�--------------------------- <br /> -------- -------- <br /> ]1W1P34000447 ADAPTER 3/4" IPS UNION INSTA @ 04/11/1994 2 8.01 <br /> ]1D11P34000547 ADIIPTER 3/4" MIP X INSTA-TITE@ 04/11/1994 1 8.11 <br /> COUP34142647 COUPLING 3/4" CTN X 3/4" MIP @ 04/11/1994 1 2.97 <br /> ELIA34101447 ELL 3/4" 90 DEG BRASS ' 04/11/1994 1 ______1_43 <br /> Total Material Cost: 20.52 <br /> Vehicles: Date Hours Cost <br /> Ip Description __________ <br /> --------�--- ------------------------------ <br /> -------- ------ <br /> V2117 CHEV 1 TON '91 04/11/1994 3.00 17.40 <br /> V213II SVC TRUCK CHEV 86 04/11/1994 1.00 5.10 <br /> VH0002 1993 VACTOR 04/11/1994 1.00 _____49_30 <br /> Total Vehicle Cost: 71.80 <br /> Work Description: <br /> ----------------------------------------------------- <br /> PACK JOINT BIAW OUT. <br />