My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7506 OLYMPIC DR 2016-01-01 MF Import
>
Address Records
>
OLYMPIC DR
>
7506
>
7506 OLYMPIC DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2017 4:43:47 AM
Creation date
2/25/2017 4:43:35 AM
Metadata
Fields
Template:
Address Document
Street Name
OLYMPIC DR
Street Number
7506
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM ATORK ORDERS REPORT <br /> Total Uti�ity Maintenance Manag��ment System <br /> 08/12/1998 Page 1 <br /> Date Range � 06/24/1900 - 07/31/1998 <br /> CM Work Order Range : 08108U0810001 - UT2830-30-322Pattern :7107.196751463 <br /> Item Range : <Blank> • WVL3694L0, Pattern : * <br /> Program ALL Function ALL Activity ALL <br /> ______________________________________________________________- ----------- <br /> CM WORK ORDER ID: 7101196751463 Title: CONVERT 7506 OLYMPIC DR <br /> «DUPLICATE PRINTIN� OF THIS WO.RK ORDER» <br /> Item ID: WS0785K019 -- WATER SEI2VICE <br /> Location ID: -- <br /> Program 710 Function 119 Activity 675 <br /> Date Completed: 07/17/1998 <br /> Overall Craft : <br /> Issued: OS/26/1998 Issued by: WMW Assigned to: <br /> Out of Service? NO Priority: Tra��al Time: 0 . 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status : <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------- <br /> ----------------- ----------- --------- - --- <br /> UL CSG CAVANAH, SHANE G. 0 . 00 4 . 00 58 . 04 <br /> UL DMJ DOUCETTE, MARK J 0 . 00 4 . 00 _____64_80 <br /> Total Labor Cost : 122 .84 <br /> Materials: <br /> ip Description Date # Used Cost <br /> -------- -------- ------ <br /> BOX000065547 BOX METER CONC W/STEEL LID 07/17/1998 1 48 . 91 <br /> METE36089447 METER 5/8" X 3/4" NEPTUNE T-10 07/17/1998 1 _ __ 30_67 <br /> Total Material Cost : 79 . 58 <br /> Vehiclea: <br /> jD Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V2117 91 CHEV 1-TON HYD UNIT 4 . 00 20 . 80 <br /> Total Vehicle Cost : 20 . 80 <br /> Work Description: <br /> --- ------------------------------------------------------------------ <br /> tdETER #41909.160 <br /> 20 ' RIGHT OF LEFT AND 27 ' OUT. <br /> Total r_cst foi� work order 7101196751463 : 223 'z2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.