My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1005 PACIFIC AVE 2016-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
1005
>
1005 PACIFIC AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2017 4:55:30 AM
Creation date
2/25/2017 4:54:35 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
1005
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��� <br /> O� x . <br /> C N ' <br /> y�� �w�'" � a�,�1 <br /> �y� t�'r Ya�.�, ��° <br /> y '`�p;i..., .� . . <br /> r�"t�e' �,� �i1�� L^���i'�7�:' . . <br /> � o <br /> �� g February 27, 1990 � "�^�` <br /> �• � everett <br /> z>y� <br /> r H H Mr.John Switzer <br /> g�' N puget Sound Kidney Center <br /> o Cq y 1005 Pacific Avenue <br /> �[� t� Everett, Washington 98201 <br /> H�n <br /> HOfn <br /> SUBJECT: Backflow Prevention for the Dialysis i4ater Supply <br /> Dear Mr. Switzer: <br /> As per our conversation this morning, the City requires that <br /> a reduced pressure principle backflow prevention device be <br /> installed in the new water supply line to the dialysis <br /> equipment on the first floor. This device must be installed <br /> so that it prevents potential backPlow from the dialysis <br /> manifold into other areas of the building. <br /> The plumbing inspector is willing to issue a temporary <br /> '�1 plumbing permit (good for 30 daysj in order to allow you <br /> time to determine the best solution for mecting the City's <br /> 1 ' backflow prevention requirements. <br /> � Zn order to insure a proper installation of thF r.equired RP <br /> � ' device, our plumbing inspectors are available for <br /> ��' consultation prior to your contractor making the <br /> installation. Please contact them at 259-8800. lf you have <br /> 1 any trouble reachinq them, call me at the same number and I <br /> ' will make the arranqements. <br /> I apologize for not resolvinq this matter sooner. However, <br /> '� we were tryinq to break new ground and were not able to <br /> � reach a consensus without taking the more conservative <br /> �� approach. Thank you for your patience and cooperation in <br /> this matter. <br /> f�; Sincerely, <br /> '� I+lfred R. Theal, P.E. <br /> Public Works Director/City Engineer <br /> ►_� ,c��,�r/��G1 <br /> Daniel Lowell � <br /> Operations Superintendent <br /> PUUllC IVOIiKS UEPAR`rME\T <br /> � ��� 32U0 Cedar$lrccl, Bvcrrlt,N'ashin�;lon 9ti201 (20G1 2�9-Sti00 i'AX (206)2�0-SR82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.