My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1019 PACIFIC AVE 2018-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
1019
>
1019 PACIFIC AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2018 8:25:56 AM
Creation date
2/25/2017 4:58:43 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
1019
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' C PUsucWorucsDseaxrMErrr � <br /> ��V/�� rr <br /> Utilides Division,3200 Cedar Street <br /> Everett WA 98201 <br /> 425-257-8800 <br /> Receipt # � ���� d� Date Paid (y a'7` '/U <br /> Cost of Work Order Work OrderN <br /> X Cost of Service Order ��'�S�°i Service Order# <br /> Contact Person Androw M. Hall, AIA Telephone# 425-259-0868 <br /> Requested By Gordon WitCher Date of Request 5H7H0 <br /> Property Owner(name) Puget Sound Kidney Center <br /> Charge Cost to(name if different than owner) <br /> P_ddress 2727 Oakes Ave, Ste 100 City Everett Zip 98201 <br /> Installation Location 1019 PaCiflc Ave <br /> InstallaHon type/description/size/etc. 6" DCDA, tap, cross Nassau, set vault, and DCDA and stub <br /> out of vault. Complete restoration by C.O.E. <br /> � The following estiniate is based upon the UH1iHes Division providing all labor,equipment, <br /> materials, restoraHon,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working davs in advance of required installation <br /> datc to allow for scheduling and varts procureir.cnt <br /> 6Vhenever the estimated cost is not sufficient fo cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deEicit shall be charged to the property for which such installation was made ana the <br /> owner lhcreof, and provided further, that any excess payment shall be returned to the person applying fot the <br /> installation. <br /> *Deposit ntust be paid prior to ordering parts or scheduling work. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Afa�crial 8482.00 «� D1dg.PermitCenter <br /> Mark Sadler <br /> Labor and 13cnefits 8359.00 Kirk Brooks <br /> li ui mient Rental 4150.00 Gordon Witcher <br /> 9 I Matt Welborn <br /> '�'1� 367.00 Mike Ward <br /> rrtt. :_��_.. <br /> TOTAL _ 21,358.00_ Randy Allen <br /> Prepared by: Mike Ward (N� LY/Date Estimate Prepared 6/1H0 <br /> rlcceptcd by: �-1 C r••� / Representing <br /> ESTIMATE GOOD FOR 6 DiONTHS <br /> S:\"Conmion\derical\CosLest\20t0\1019 PacificAeedoc � <br />
The URL can be used to link to this page
Your browser does not support the video tag.