Laserfiche WebLink
. �. rx ( <br /> t � <br /> � �r � '� ai.scrx�c,�+r, coxsui.T�xTs, nrc <br /> �/II/ is�s a6��.�e.w.s�x s rro.�c�ts�rs-��» <br /> V L�wroo4 WA !�0]6 FAX: (13�774-9i90 <br /> Septanber 17, 1999 <br /> Orthopedic Con�ulhnb of Washington <br /> Peak Demand Caknlatiou <br /> • (hility Company Dpnand on Savia not Available <br /> . 30 day ammeta in�alled on rtuin�avice co�ducton on 8/3/99 rxording in 60�econd iMuval� <br /> p�g,�� 320 amps <br /> 320��203V, 3ph� l 15.2 kVA <br /> � ����j�• x 1.35 <br /> NEC 220.35 Adjwtment x 1.25 <br /> Total Pak Demand 194.40 kVA <br /> •Buildin�htt electric hat uid'w ur conditioned. The mechanical en6inar indicued the wituer heatit� <br /> load wouW be slighdy higher tiun the wmma air conditioning load in tlds building. Meta rading was <br /> taken in Auguat wha►ur conditioning was opa�ting at full capacity. One of the thrae taunt�puxs wu <br /> tac oocupied during tltit time, (�pproximatdy 25X of buildin�. <br /> gaud on thae itemt,I fal an adjwtment factor of 1.35 can be addcd to the peak demand for tFut 6ic�itY• <br /> Pleae contact me if you have any questions. <br /> SinarelY, <br /> AWAElecttical Consulta� <br /> /�%�� ` <br /> Brad Adcock, V'ice Prosident <br />