My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1111 PACIFIC AVE 2016-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
1111
>
1111 PACIFIC AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2017 5:16:22 AM
Creation date
2/25/2017 5:15:54 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
1111
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> 1 <br />� <br /> 7uly 30, 1980 < <br /> '..�. <br /> the Evergreen <br /> GITY OF <br /> Donald L. Berkey, P.E. <br /> Chief Distrtbution Engineer everett <br /> Snohomish Cowty P.U.D. <br /> P. O. Box 1107 °�•• "•`•. :••�•>" <br /> ' Everett, WA 98206 `°`""�. ""•��"a�'� <br /> ..:o� <br /> ATTN: R. 5. Billings �____ <br /> Subject: P.U.D. Permi �80-16 � <br /> W.O. 0091171��- <br /> Dear Mr. Berkey: <br /> ',tour application for a perniit,.to.inctalk-�n underground power system within <br /> the public right-of-way for111�_ 1 Paeific,has been approved on July 30, 1980, <br /> as per plans. <br /> The subject permit approval is based on the ag;eement that all work will be <br /> carrled out in accordance with the City of Everett standards and American <br />`�t Public Works Association specifications for trench excavation and backfilling <br />'I� ' (Reference: Section 61, par. 3.05 and 3.06). All hard surface street crossings <br />% � shall be by jacking, buring or other preapproved construction methods. <br /> It wlll be the obligation of the utility company to bear any costs that may be <br /> i�curred in testing and confirming the requirement. <br /> The restoration of all landscaping and repairs will be comparable with its original <br /> condition and to the satisfaction of the City Engineer or his appointed representative. <br /> It will be your responsibility to contact the City C:ngineering Department (phone <br /> 259-8811) immediately prior to starting construction. <br /> Sincerely, <br /> HUGH WARREN, i'.E. <br /> i public Works Director/City Engineer <br /> � ���� ""1_ �"'_�� <br /> �/ <br /> By: Jeff Kerwin <br /> Utility Inspector <br /> JK:jcl <br /> � <br /> 1 <br /> � <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.