My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1315 PACIFIC AVE 2018-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
1315
>
1315 PACIFIC AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2018 9:27:38 AM
Creation date
2/25/2017 5:38:58 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
1315
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
379
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DnJnaye <br /> Drainage behind the permanent beloH� grade walls is typically provided using s[rips o(drainage material <br /> attachcd to the lagging betw�een the soldier piles. The drainage material strips should he wnnected to <br /> weep pipes which exicnd through the perimcter building wall at thc footing elevation. The wecp pipes <br /> should be hydraulically connected to the sump, and may be designed for a hard connection to the <br /> perimeter footing drains discussed above in"Below Slab Drainage." <br /> Thc catth pressures presented in Figurc 4 assume thal adequate drainage is provided behind the wall. As <br /> discussed prcviously, prcfabricated geocomposite drainage strips, such as MiraDrain'*', should t�e <br /> installed vMically betn•ecn the soldier pilcs. The drainage strips should be installed on the excavation <br /> side o(the lagging with Ihe fabric adjacent m thc lagging. The drainagc strips are typically a minimum oC <br /> 16 inches wide and extcnd the cntirc hcight of the walL Additional drainagc strips may be necessary in <br /> wet arcas. <br /> EARTHWORK <br /> Subprade Preparation <br /> The in-sim soils at thc planned parking Icvel finished tloor and faoting clevations may consist oCdense to <br /> vcry densc sand with variaUlc silt conlcnt ovcr thc majority of thc site, except whcre deep fill associated <br /> with the sewcr pipe exists. Gxisting fill may also cxtend b.:low thc parking slab in local areas. The <br /> cxposed subgradc should bc cvalualcd aflcr sitc cxca��ation is completc as dacribed in the slab-on-gradc <br /> subgradc prcparation scetion of this rcport. <br /> Sbuctural Fl11 <br /> Fill placed io support foundations, thc parking slah•on-gradc, placcd brhind rctaining sttuctures, and <br /> placed below sidewalks H�ill necd lo bc spccificd as swcwral fill as dcscribed below: <br /> • Structural fill placcd lo support building foundations designcd for no more than 4,000 psf bearing <br /> pressure should consist of imporled Gravel Dorrow per WSDOT Standard Specification <br /> Scction 9-03.14(1). <br /> • Structural fill placcd to support thc parking levcl concrctc slab•omgradc should consist of <br /> importcd gravcl if placed during wcl weather; however, if work is performcd during the drier <br /> summcr months then impoAcd common borrow per WSDUT scction 9-03.14(2) or suitablc on- <br /> sitc soil may bc used. <br /> • Structural fill placcd around perimetcr footing drains and undenlab drains should meet the <br /> requirements oC 1A�SDOT Spccification 9-03.12(4), Gravel Dackfill tor Drains or consist o(pca <br /> gravcl. <br /> • Swctural fill placcd as capillary brcak material below the parking Ievcl slab-on-grade should <br /> mcc�thc rcquircmcnls of WSDOT Spccification 9-03.1(4�,Grading No. 57. <br /> • Strucwral fill placcd as crushcd surfacing basc coursc bclow pavcmcnts and sidcwalks should <br /> mcet Ihe rcquirements of N'SDOT Specification 9-039(3),Crushed Surfacing Base Course. <br /> On-sitc Soils. 7hc on-sitc soils arc moisture scnsitivc, finc-greincd soils that will bccome wsily <br /> dis�urbcd w�hen wct. 13ased on our laboratory tcsting, the majority of thc cxcavated soils will likely havc <br /> in-sihi moisture con�ents ncar or abovc the optimum requircd for compaction. Suitable on-sile soils may <br /> be used during the drier summer months as structural fill bclow the parking level slab to backfill <br /> F71r.\b. I71C-001-INI raR�'/3 �7[OEMO�MEE�� <br /> Junr M1.1011,1' <br /> I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.