Laserfiche WebLink
c woRx.s � _-- <br /> Ave�r <br /> Sentvia e-mail <br /> �/ �� ( Z ��t, <br /> February 16, 2012 <br /> Mr. Ron Auld <br /> Synergy Construction � <br /> RAuld�synergyconstrudion.com <br /> Project: Potala Village Mazatlan Restaurant i <br /> ]ob Address: 1325 Paciftc Ave � <br /> Plan Review: K1202-003 � <br /> Dear Mr. Auld, <br /> In response to the applicatfon for a sprinkler permite I hood cannot bee sued untit he <br /> you are advised that a suppression permit for a Typ <br /> mechanical permit for a Type I hood has been submitted, reviewed and issued. Two set <br /> of Type I Hood documents are required for plan review to begin (see attached checklist). <br /> Some of the requirements are listed below. <br /> 1. A Type I hood exhaust requires the following to be shown on the drawings: <br /> a. Schematic cross-sec[ion through hood at a scale of '/z"=1'-0" indicating <br /> texts ch ough the bu Idi g�floor(s) above�, and rloof15�Include at edion as <br /> through the exhaust fan, make-up air supply, and indicate all clearances and <br /> dimensions required by the mecha�ical code from adjacent constnrdion. The <br /> sed(on should also (nclude details for: <br /> i. The specific Iisted material and fire-rated enclosure required by the <br /> mechanical and building codes, with detailed drawings of any <br /> clearance reduction methods allowed per the mechanical code. <br /> ii. An equipment Ifst of equipment served, if not available on the building <br /> permit plans. <br /> b. Schematic wall elevation (for all adjacent walls) and reFlected ceiling plan (if <br /> the hood is adjacent to ceiling construction) showing the material specifled <br /> by the mechanical code to reduce hood and duct clearance from adjacent <br /> combustible construction, extending 18 inches beyond and above Type I <br /> Hood. <br /> c. Dimension of hood extensions beyond the equipment served, and clearances <br /> to the equipment. <br /> d. Schematic roof plan showing the dimensional separatfon of exhaust, make-up <br /> air, and adjacent structures. <br /> e. Duct materials and thicknesses; exhaust and makeup afr CFM requirements; <br /> hinged exhaust fan. ression <br /> f. Deferred flre suppression permit submittal provided by supp <br /> contractor. <br /> i. Interlock of suppression system to automatic building suppression and <br /> detection systems. <br /> i(. Accessible locatfon of the manual adivation device. <br /> Applicable codes include: 2009 international Building Code (IBC), the 2009 Intemational <br /> Fire Code (IFC), the 2009 Intemational Mechanical Code (IMC), the 2006 Washington �//J <br />