Laserfiche WebLink
CLOBfiD C![ wOR� ORDE1t8 REPORT <br /> Total Utility Maintenance Manaqement System <br /> 03/26/1997 Paqe 2 <br /> s:saaeassaaas�s�x=s=cccv===cv=cxcv=====ec=e=s==ss=sccceevcxsaea===c=exsssxccvsa <br /> Date Range :01/09/1989 - 03/21/1997 <br /> CM Work Order Ranqe :1001091070001 - 7401196770910Pattern :7101096750276 <br /> Item Ranqe :<Slank> - FNL3694L05 Pattern :* <br /> Proqram ]►LL Function ALL 1lctivity ALL <br /> a�s�sns�a�a��s����a�ssv�ss���ss�s�s�ssssssssssssssssaa�s�ssssss�tss��s��sss�sss <br /> CM WORK ORDER ID: 710109G750276 (continued) <br /> PIPE44304247 PIPE 6" PVC SEWER 02/21/1997 7 8.75 <br /> PLUG42307647 PWG 4" (PVC) SEWER BELL END 02/21/1997 1 1.33 <br /> PWG44307747 PWG 6" (PVC) SEWEFt BELL END 02/21/1997 1 2.02 <br /> REDU4430]647 REDUCER 6° SP X 4° GASKETED 02/21/1997 1 4.77 <br /> TEE044306047 TEE 6" ]1LL GASKET (PVC) 02/19/1997 1 9.13 <br /> WYE042�01847 FiYE 4" ]1LL GASKETED 02/21/1997 1 <br /> FiYE044103947 WYE 6" ALL G7ISKETED 02/21/1997 1 10.48 <br /> Total Material Cost: 502 36 <br /> "" 4�I.s�_ <br /> vhici•s: �� $s- <br /> ID Dascription Hours Cost <br /> ------------ ------------------------------ ------ ---- •----- <br /> V0003 92 FORD VAN 4.00 21.60 <br /> V0010 '92 GMC S10 PU 7.00 37.80 <br /> V2085 91 DODGE PU 1/2 TON 4. 00 21.20 <br /> V2113 91 CHEV 1-TON 4. 00 21.20 <br /> V2147 87 CHEV 1.5 YD 5. 00 45. 10 <br /> V2152 87 DODGE iQ!HOIST 18.00 86.40 <br /> V3507 88 CASE BACKHOE 4X4 4.00 147.60 <br /> V3603 86 CASE B]►CKHOE 780 19. 00 752.40 <br /> V6807 89 COMPRESSOR IR 18.00 86.40 <br /> VJ0002 93 ZNTERNATIONAL 10 YD 19.00 406.60 <br /> VJ0005 �95 FORD 1.5 Y�RD 1.00 9.70 <br /> Total Vehicle Cost: 1636.00 <br /> Nork Description: <br /> -----------------------------------------�-------------------------------------�- <br /> REPL�ICED SIDE SEWER FROM BUILDING TO COLLECTOR LIINE. SIDE SEWER l►T BU'ILDING <br /> 2'DEEP TOP OF STANDPIPE 3 '6"DEEP. COLLECTOR LINE lU' DEEP. 1\ISO INSTALLED <br /> CLEAN OUT 2 ' £ROM BUILDING. INSTALLED AT ORIGINAL IACATION. <br /> Total cost foi work order 7101096750276: 4006.98 <br />