Laserfiche WebLink
z <br /> I ` <br /> � <br /> I Pacific/Pine Restaurant ped access <br /> � <br /> ,. _ Ron Cameron <br /> �,,,.-� February 9, 1983 <br /> ..,,. . interim requirement ' " ' <br /> PeA access along Pine from Pacific to the siAwalk nurth of where the restruarntiee <br /> is going in can be proviAeA by using a 5 foot gravzleA walk way until it is <br /> AetermineA whether or not the LID is approveA. Assuming this decision process for the <br /> LID is less than a year and the greveled walkway will be replaced in approximately 18 zo <br /> months. � <br /> � <br /> If the LID is not approved or it appears that it will be more than 12-18 mo�ths of `•'•' <br /> time between restaurant opening and LID sidewalk design/construction, then, <br /> the first step woulA be to put �n apaveA path if it is still a short time, the siAewalk � T <br /> is obviously going to be cor,structeA in a short time,; the second step wouln be to � <br /> proceed with a 555 type sidewalk, curb, gutter improvement. �+ m <br /> 0 <br /> The particular alignment cou1A be on the same as shown for the sidewalk plan Arawing m � <br /> attacheA to the 2/283 Crawforcl me;no. 0 3 <br /> m <br /> -a z <br /> m � <br /> .. <br /> .o z <br /> c <br /> � _ <br /> -i in <br /> < <br /> T <br /> O .'V <br /> „ a <br /> s <br /> -i m <br /> z <br /> m � <br /> � <br /> v <br /> o r <br /> c imi+ <br /> � N <br /> m <br /> z � <br /> �m <br /> a <br /> a <br /> -i <br /> S <br /> A <br /> Z <br /> --I <br /> 2 <br /> N <br /> 2 <br /> ' O <br /> --1 <br /> c7 <br /> m <br /> 1 <br />