Laserfiche WebLink
�� i -i <br /> , <br /> ,o Hugh Warre�. ���`�I���?� �' �r <br /> �.� �� 2-77 ,_r ., d <br /> Faon, 9erry Carroll ��� .>�.,,.�!r,� ='� �`.`��.1 -_. <br /> /, I )�.�..: (/.t:�m•-�~� <br /> DATE <br /> �2-Z-71 � l/. L^N.1.�Ws'� <br /> , . , ` I_, �,_t,:-.,�=, �u, �:'1��;j� <br /> �,.,.r-, <br /> suu��crDenny's Restaurant + tilr or �v�n�11. u-�r+cr*. w�sr�(ucro" � <br /> We have reviewed the plans for suUject development. Following are our comments <br /> relative to the construction divieion's area of responsibility. <br /> 1) Atley should be regraded with the low point in the middle of alley to bring <br /> all surface water to a catch basin and into the 48" sanitary interception. <br /> 2) Resurface alley with 2" asphalt miniinum <br /> w� <br /> 3) An addition catch basin should be ad3ed to the parking lot area. (Suggestion <br /> only. This is on private property and is owners area of. concern. ) <br /> 4) I believe Craig Thompson has specific recommendation on how slurm water should <br /> Ue routed into the interceptionrnn:.^. <br /> 5) If trees are to remain on Pine Street, rainp new sidewalk up a sufficient distance <br /> to eliminate proUletn �vith roots. <br /> 6) Remove exis ting curb trom point of curvature on Pine StreeC, around the corner <br /> and east on Pacific Co Maple. A type E-1 ceinenl concrete curb should Ue re- <br /> constructed in ils place. <br /> 7) All new sidewalk shouLd be "Type B" (APWA Specification) <br /> 8) New driveway approaches should be "Cement Concrete Driveway Type B or <br /> Type A" as required. <br /> 9) Catch Baeins should be Type I-C (AP�tiA Specificationa) <br /> 10) A wheel chair ramp should be constructed at the corner of Pine and Pacific. <br /> I1) Inatall Type 60B traps in all calch basins. <br />