My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2917 PACIFIC AVE 2018-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
2917
>
2917 PACIFIC AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2018 1:42:05 PM
Creation date
2/25/2017 7:40:06 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
2917
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�, <br /> :�� n1ax'vin C. IIaglund, L ctor of Utilitie " " �� ���� i <br /> �� \ Roy VanDerMeersche, Water Supt. & ig Thompson, Sewer Sugt. `.. . <br /> �� w � <br /> ��A*t: November 29, 1977 �` - , � <br /> 51BJ<<r PROPOSED DECLAR,ATION OF NON- T�� <br /> c�rr or �v r �tHin� H <br /> SIGNIFICANCE - Construct two story p����- ��l � <br /> build'u?g (9200 sq. ft. ) radio station - <br /> located N.W. corner of Pacific Avenue �� ^ r 21977 <br /> and Maple Street. rW� <br /> . <br /> �,:... a, �ETT. <br /> 'Cl'C'( ^ - De,P%� <br /> �'�ATER: ��QeT"� <br /> The water recorda indicate that 4here is a 6" caet iron water main with approxi <br /> inately 95 psi static pressure on the west aide of Maple Street to aupply this <br /> location. <br /> The construction of this building will not have a significant impact on the wate L � <br /> system. The Water Department should have no objections to the proposal. / q�� <br /> S��'VERS: / , . <br /> There is a 6" se�ver main in the alley behind the proposed aite. This line has <br /> very.marginal capacity to serve the proposed building and I would strongly <br /> suggeat that it not be used. There ie a 42" sewer interceptor line in,Pacifiq <br /> � __�_ . . - - <br /> which I would recommend the �anitary sewer be �onnected to. <br /> � — -- — _ _ -- <br /> DRAINAGE: <br /> T nresume from the remarka about connecting the roof and parl�ing lot drainage <br /> te the storm sewer that they intend to ;.onnect the drainage to the 48" overflow <br /> line in Pa.cific. I agree completely with this. <br /> Based on what I understand o." their connection proposals, no storm drainage <br /> detention should be neceseary and there should not be a significant impact on <br /> the Sewer Department. <br /> I would suggest that connection to the 48" overflow line in Pacific be accomplished <br /> through cooperation with the Denny's project such that there is only one storm <br /> .3rain connection to the 48" which comes down the alley. � / <br /> '/ � ����' '� �� d,�;�D� �. <br /> � ,'��, /� J �y'4�'���� �� <br /> , �� � ��c� <br /> � 1 ��z;�� , <br /> � �� �. <br />
The URL can be used to link to this page
Your browser does not support the video tag.