My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
900 PACIFIC AVE BREAST CENTER 1ST FLOOR 2018-01-02 MF Import
>
Address Records
>
PACIFIC AVE
>
900
>
1ST FLOOR
>
900 PACIFIC AVE BREAST CENTER 1ST FLOOR 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 9:14:43 AM
Creation date
2/25/2017 8:14:49 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
900
Unit
BREAST CENTER
Tenant Name
1ST FLOOR
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O � <br /> � e � <br /> a <br /> r <br /> � < z <br /> A 20 � Rxommend swinging all doors to dressing booths outward in Dressing/Subwait <br /> 103B for entry/exit ease of patient. <br /> p 21 � Provide cubicle curtain at Doors 133B, 133D, 134B, 143B, 143D, 144B, 145B, <br /> and 147B,or explain how privacy will be providtd if these doors a�e opened <br /> during an ezam/proceduro. WAC 246-320-785(3)(e) <br /> 21.1 Not Approved 3/IS/02 Provide a response conceming Doors I34B, 143B, 143D, <br /> 144B, 145B, and 147B. <br /> Approved 5/1J02 Revised drawiegs stww cubkk curtoine at ail t6ese doors. <br /> 21.2 Not Approved 3/15/02 Provide revised drawings showing the cubicle curtain at <br /> Door 133B, revised hardware schedule,and copy of steff procedure for poor <br /> 133D. <br /> Approved 5/T/02 Revised drawings show cubide curtains�t dl NKse doors. <br /> p 22 � Provide information on how the stereotactic procedure will function with the <br /> table against two walls as shown on Sheet E2.0. WAC 246-320-5C►5(2)(a)(i) <br /> 22.1 Not Approved 3/IS/02 Provide revised Sheet E2.0 showing power conduit <br /> locations and connections for stereotactic procedure system. <br /> Approved S/1Ji02 Revtsed Shcet E2.0 slwws power conduit ond oonoections. <br /> Page 7 of 7 Plan Review Com-nents fa Project M 6433 <br /> Revicw Key: A=Architect F=Fire&Life SatMy S=Sanitarian M=Mechriical/Elxtrical C�Conhteno!Nale <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.