Laserfiche WebLink
Providence Everett Medical Center <br /> Chapter 246-320 WAC Hospitals <br /> Brea.st Center(Outpatirnt) <br /> Review Commeate <br /> 8 . � <br /> � � � � <br /> S 1 � Provide a sink in the film developing area WAC 246-320-785(1)(bxv) <br /> Approved 3/18/02 as per response letter dated 3/4IOZ indkaHn`roan is ooly <br /> used for loadiug ot tilm cassettes. <br /> g 2 � What are the boxes in doors 148B and 137B? WAC 246-320-SOS(2) <br /> Approved 3/19/02 ss per respon.ge ktter indicating boxes are relites in the <br /> doors to the soiled uWity and 6onaekeeping. <br /> g 3 � Obtain approvals for Radiation Shielding from DOH-Rediatien Protection for the <br /> Stereotactic room 132B. Contact Alton Jenkins u(360)23C�'231. Provide a copy <br /> of the approval letter. <br /> Approved 3/18/02 as prr respoex ktter dated 3/4l'02 aed In[orm�tion memo <br /> indicatlng shielding review[or a mamrta stereotactic bbPsY ayatem is n� <br /> rEquired. <br /> S 4 � Locate housekeeping for this area. WAC 246-320-785(1)(axiii) <br /> Approved 3/11/02 aa per response letter locating housdccepin`on eame Noor <br /> across trom waiNng lobby. <br /> S S � Provide manufacturers labeled cacpet speci!ications and radiant panel test report. <br /> WAC 246-320-525(6)(b) <br /> ppproved 3/19/02 as per-esponse ktter u�d m�eu[�ctnrere specltfcalloos <br /> stating"I,ees,Kerry D4736,Broadloom". <br /> S 6 � Place a reduced pressure backflow assembly on the water supply to film <br /> developers. WAC 246-320-525(4xa) <br /> Approved 3/19/02 rs per response ktter locating reduad pt�asure backtbw <br /> assembly on the revised plumbing pl�n P2.0 and Indicated in key nohs�2. <br /> �Y <br /> Page 3 of 8 PLn Review Cortrrcnta for Projat k 6433 <br /> Review Key: A=Architat F=Firc dc Life Sakty S�Saniurim 1�1.Med�oicr��e�kr C���� <br />