My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
916 PACIFIC AVE 1ST FLOOR 2018-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
916
>
1ST FLOOR
>
916 PACIFIC AVE 1ST FLOOR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 12:17:36 PM
Creation date
2/25/2017 8:30:27 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
916
Tenant Name
1ST FLOOR
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
764
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n � � (�O �� i PUBLI�ILITIESEDIVISION <br /> u J U <br /> COST ESTIlIATE BHEET j 2300 CEDAR STREET <br /> W MAR 18 �gr� ,� �ERETT, WASHINGTON 98201 <br /> .�......................... . . (206) 259-8800 <br /> CITY OF��EVERETT.... <br /> Receipt f Date Paid s c�-�� <br /> P�Wic {Norks Uept. <br /> __ Cost of Work Order $ Work Order �' <br /> �_ Cost of Service Order $12.496.00 Service Order � <br /> Cor7tact PersoA:_ Jeff Moore Telephofle # 259-9191 <br /> Requested Sy: _Kirk Brooks Date of Request 03/10/�_ <br /> Pr.operty Owner (name) Providence HosDital <br /> Charge Cost to (name if different than owner) Botesh Nash. xat7 <br /> Address _g206 Hovt ve City �verett. WA Zip 98203 <br /> Installation Location _Nassalf and Paci �c 916 Pac 'f;� <br /> Installation type/description/size/eto. �xcavate Ta� 8" Main with 6" <br /> Tau, insta� l 6" Meter and Vault Rper�,-e area <br /> [Xj The following estimate is based upon the Utilities Division <br /> providinq all labor, equipment, materials, restoration, and final <br /> hook-up. <br /> [ J The followinq estimate is based upon the Street Division work group <br /> providinq all labor, equipment, materials and restoration to <br /> property. <br /> Whenever the e�timated eoet i• not �ufficient to cover the total expense for labor, <br /> material, equipment rental and •dmini�trative coots, the deficit shall be charged to <br /> the property for which •uch inatallation wa• made and the owner thereof, and provided <br /> further, that any exceas payment ehall be returned to the person applyinq for the <br /> install�tion. <br /> ItemizeQ Co�t Estimate: <br /> Labor i� Overhead S3840. 00 cc: s1aq. permit counter <br /> Clair Olivers <br /> Materlal 7486.00 Tom Thetford <br /> Don Weitkamp <br /> Equipment Rental S 970. 00 Kirk arooks <br /> Gordon Witeher <br /> Surface Restoration $ 200. 00 Don wahl <br /> TOtal Dan Lowell <br /> ]2 96. 00 Stan Hitchell <br /> Prepared by John Garza 6�� <br /> Accepted by Representing <br /> a.,.n.e OB/I6/9] <br /> JGB70[ST (014]-92) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.