My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
916 PACIFIC AVE 1ST FLOOR 2018-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
916
>
1ST FLOOR
>
916 PACIFIC AVE 1ST FLOOR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 12:17:36 PM
Creation date
2/25/2017 8:30:27 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
916
Tenant Name
1ST FLOOR
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
764
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•1 .�.�._.,�,..,� <br /> � <br /> : , <br /> '_:-- _,.J � <br /> ` �'� 1 <br /> April 15, 1999 :�;_;,:✓ , <br /> ��.�.....� <br /> Providence Hospital <br /> P.O. Box 1067 <br /> Everett, WA 98206 arr oF <br /> everett <br /> Job Address: 916 Pacific Ave (Rdd/FluOr ROOm) PUBIICWORNSGEFMITMENT <br /> Permit Number(s) : 19347 (Building) �ZOO�EO�RSiREET <br /> EVERETT,W�SMINGTON <br /> Date of Permit(s) : January 13, 1988 se�o, <br /> A review o� our inspection records reveals that the last inspection made at <br /> the subject address was on January 21, 1986. <br /> Section 303(b) of the Uniform Buildinq Code provides that permits expire by <br /> limitation and become null and void if the building or wo�i: authorized by <br /> permit is surpended, after the work is commenced, for a pe-iod of 180 days. <br /> The Code also requires final :nspection prior to occupancy for all permits <br /> issued, and it is the responsibility of the permit holder t.o call for the <br /> neceaeazy inspections. eecause of these time frames, your permit haa already <br /> expired. <br /> However, the City of Everett is at this time extending a one•time qrace <br /> period to holders of recently expired permits. Zf you wish !:o recommence <br /> work you wy z�new your permit al• no cost f.or an additional ,.80 day period <br /> by submittinq a written request to �h:.s office. The renewal request must <br /> reach us by #pril 30 198^. if the work has been completed, �ou mny call for <br /> :inal inapection before April 30th. pny corrections required nust be <br /> completed and final approval obtained before that date. Permits that have <br /> been neithpr finaled nor extended by April 30 1989 will expire. To renea <br /> the work or obtain an inspection will then require the paymen: of a fee. <br /> You may matl or deliver written requests to our office at 3201� Cedar Street, <br /> Everett, WA 96�01. If you have questionc or want to request an inspection, <br /> please call us at 259-8810, B:00 Nt to S:CO PM, Monday through Friday, <br /> Sincerely, <br /> ALFRED R. TNEAL, P.E. *" Please note a Certificate of Occupancy is <br /> Public Works Director required following tenant imnrovements; the <br /> Certificate cannot be issued until all work <br /> �'Ia�yc�td�1� � permitted has has final approval. <br /> By: Margaret McLeod ' <br /> Building pepartment <br /> cc: Newland Construction <br /> 'i�aCc-S �E�l PAUPERiV.' TRPrv51T UpiOA BUiL�inG oUBL�C U'N9E5 CO�+SiR�CTiON ENGiNEERING iqqFFlCENGRI <br /> :`yP'-�: �i0% 359�BB00 ViMif,LES 15Y-9900 5[RviCES 259�PB00 i�+SPECiiO`i 359�BB00 SIGN�LMAiNTENANCE <br /> �.�.c.ACO 3°3.?BW 253�9P00 P/amr5ew-• :59�P600 259�P800 <br /> D�nina4e <br />
The URL can be used to link to this page
Your browser does not support the video tag.