Laserfiche WebLink
� <br /> PROVIDENCE NORTH 11IN4 EIP111IBI011 <br /> Job ilo. •SS <br /> Jun� �, iffi <br /> 8QU11RE FOOT7►Gg8 8Q�f1�gY REMODEL If61f TOTI►LB <br /> Basemen� <br /> West Nechanical Roo�n Addition ��702 <br /> East Nechanical, Electrical, <br /> Telephone, and Vestibule 2,440 <br /> Office and Corridor Revisiona 1,0�2 <br /> Subtotals 1,OJ2 9r742 10,774 <br /> Mein Floor <br /> Emerqency Addition 6,361 <br /> Emerqency Infill Under Surqery 6 642 <br /> Entrence Lobby end Chapel Addition 2,876 <br /> Lobby, Communications, and Chapel 5,520 <br /> Dietary Addition Z�J79 <br /> Dietary, Servinq Area, and Conference 5,095 <br /> Subtotals 10,615 16,278d 28,95� <br /> Eirst Floor <br /> Surqery Addition ' ' � - <br /> Lxistinq surgery Revieions 9 750 6.840 L <br /> Surqery intake, Lobby, Admittinq � <br /> end weiting 5 600 <br /> r <br /> Subtotals 15,]50 8,840 24, 190 <br /> na�vee ee-=ae <br /> G6GSG5 <br /> Project Totels 26,997 36,820 63,817 <br /> Second Floor - (Future Project) <br /> Critical Cere Department l�ddition 4, 150 <br /> Critical Care Depertment Revieions 9,750 <br /> Subtotals 9,750 4, 150 13,900 <br /> ����__ ______ ______ <br /> GRAND TOTAL3 36,747 40,470 77, 717 <br />