My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3117 NORTON AVE C&D 2016-01-01 MF Import
>
Address Records
>
NORTON AVE
>
3117
>
3117 NORTON AVE C&D 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 4:08:43 PM
Creation date
2/25/2017 5:11:19 PM
Metadata
Fields
Template:
Address Document
Street Name
NORTON AVE
Street Number
3117
Unit
C&D
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , <br /> i <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per Ciry Standard#FiQ1. <br /> �5.� Connect side sewer per City Standard#'s 601, 602, 604. <br /> �.. Connect all rooftop downspouts to the side se�ver. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lol. <br /> 8. Rooftop runoff musl be discharged to a roof downspout infiltration system per Ciry of Everett Stcrm <br /> Manual 3-2.6.2. The approximate size lrench is 3.5'wide, 2' deep and 25' long. See attachmer�t for <br /> more details. <br /> 9. The cuntractor must meet with the Public Works Inspector to discuss potentiat drainage routing prior to <br /> beginning the project. <br /> 10. Install erosion control measures as determined by the Public Works inspec!or, such as silt fence, straw <br /> bales, swales,or erosion blankets. <br /> /11: Install erosion controi measures �er City of Everett Standards for small parcels <br /> l_.� <br /> �2., Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> �13. All excavaled material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> � " permilted site. No wasting of malerial is allowed on this building tot. <br /> �14. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> �5. No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> �16. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Slandard Plan#'s 305A 8 306 on <br /> this proposal's frontage as�lirected by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everetl Standard#307. <br /> 19. Pave driveway from lhe front property line out to the street paving. <br /> 20. Conlact lhe Water Districl for connecling provisions for lhis building's water and <br /> sewer services. <br /> ' 21.� A catch basin as per Ciry Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> � parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br /> gravity flow across lhe public right-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13 D. <br /> PWCommeNs I�� ,_��� <br /> l `�' <br />
The URL can be used to link to this page
Your browser does not support the video tag.