My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3213 OAKES AVE A&B 2016-01-01 MF Import
>
Address Records
>
OAKES AVE
>
3213
>
3213 OAKES AVE A&B 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 4:09:36 PM
Creation date
2/25/2017 5:13:00 PM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
3213
Unit
A&B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ( � ( <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> � Connect side sewer per Cily Standard#'s 601, 602, 604. <br /> � Connect all rooftop downspouls to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Stortn <br /> Manuai 3-2.62. The approximate size trench is 3.5'wide,2'deep and 25' long. See attachment for <br /> more details. <br /> � The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning lhe project. <br /> t�. Install erosion control measures as determined by the Public Works inspector, such as silt fc+nce, slraw <br /> bales,swales, or erosion blankets. <br /> 11. Install erosion control meas�ires per City of Everett Standards for small parcels <br /> � Remove erosion control m ;asures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material fron�foundation, sidewalk and driveways shall be hauled to an approved, <br /> permilted site. No wasting of material is allowed on this building lot. <br /> 14. No dirt, mud,rocks or debris to be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks lo be kept clean and open for <br /> pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gulter and sidewalk as per City of Everett Standard Plan#'s 305A 8�306 on <br /> this proposal's frontage as dfrected by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaped area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard#307. <br /> 19. Pave driveway from lhe front property line out to the street paving. <br /> 20. Contact the Water Distr:l for connecling provisions for this buildi�g's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole,then <br /> gravity flow across the public right-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> � �idi/E ��i N� !9i'L�i9 T� �/s77N� �� /��9�/ll�i� , <br /> � � �� <br /> Pwcommenu `. ��� ' <br /> ;' <br />
The URL can be used to link to this page
Your browser does not support the video tag.