Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />Address � �� O� �`�! r � <br />Contractor �2'E�� � _/� v� /�C� <br />Owner ,v��.� • <br />Date / ZZ— � / <br />TYPE OF INSPECTION REQUESTED <br />fl BLDG: Pmt. No. �MECH: Pmt. No. ��o7`f' <br />C' ELEC: Pmt. No. ❑ PLBG: PmL No. <br />❑ lemp. EIecL ❑ Masonry ❑ Consultation <br />❑ Footing ❑ Framing ❑ Groundwork <br />f� Foundation CI Drywall, Nailinc� ❑ Struct. Slab <br />il Ductwork ❑ Rough•In ❑ Final <br />❑ Wood Stove _ Service [7 <br />. � Gas Piping <br />APPROVAL ❑ PARTIAL APPROVAL <br />IOLA ❑ CORRECTION REQUIRED <br />`.', Corrections listed below MUST BE MADE 6efore work can be approved. <br />;1 Please contact ins�eclor and arrange for appointment. <br />�' NJas not able to perlorm inspeclion. <br />fl CALL-25�rt5 FOR REINSPECTION -- 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspeclor <br />� <br />