My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
916 PACIFIC AVE BLOOD BANK 2016-01-01 MF Import
>
Address Records
>
PACIFIC AVE
>
916
>
BLOOD BANK
>
916 PACIFIC AVE BLOOD BANK 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2017 5:25:14 PM
Creation date
2/25/2017 5:25:08 PM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
916
Tenant Name
BLOOD BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> Carl A. Munding <br /> Providence Hospital <br /> CCRS #�87820-1211-001 <br /> November 13, 1987 <br /> Page Two <br /> 4. Please verify ETO alarms and evacuation systems. NAC <br /> 248-18-680(3)(b) (iv). <br /> MECNANICAL CONSULTANT'S REYIEW <br /> Claude V. Laws, P.E. 753-3489 <br /> Mechanical Items: <br /> 1. What is the purpose of the hood in pack area M57 <br /> 2. Are the hoods in IV room N5b recircutating type7 If not, show <br /> duct connections to the outside, make-up air, etc. <br /> • 3. Verify locations of required fire-rated wa11s and ceilings with <br /> architect and show all ffre dampers. <br /> 4. Label and connect ceiting diffuser to ducbvork in respiratory <br /> therapy M9. <br /> 5. There appears to be an extra ceiling diffuser in office N26. <br /> Eitfier label and conn�!ct it to ducA+ork or delete it. <br /> 6. Verify requirements of ethylene oxide system. A1arm system wt11 <br /> be required. Transfer grille to preparatton and packing N11 mqy <br /> not be a1la+ed. Gas bottles may not be atlowed to be stored in <br /> laation sharn. <br /> 7. Specify temperature controls and shoMr thermostats. <br /> �' B. N111 a fire sprinkter system be specified? <br /> 1 Etectrical Items: <br /> i <br /> 1. Complete all schedules. <br /> 2. If ar�y 1igh4 fixtures are recessed in rated ceilings, they must be <br /> tented. Yerify construction with architect. <br /> 3. Shav locations of a11 requi��ed alarms. <br /> 4. Specffy or show fire alarm system on drawings. <br /> 5. Ne electrical outlets are shown in rooms �"4, 5, 48, 63, and wait- <br /> in�� area. Verify that none are required. <br /> 6. Verif� that telephone outtets will not be needed in rooms N14, 18, <br /> 23, 38, 48, 56, and 68. <br />
The URL can be used to link to this page
Your browser does not support the video tag.