Laserfiche WebLink
i <br /> � <br /> � . �= ,.�. � ,- <br /> Carl Munding <br /> Providence Hospital <br /> CCRS N87819-1210-001 <br /> September 14, 1987 � <br /> Page ?ao <br /> i <br /> 2. Clarify note 14, Sheet M-1. ; <br /> 3. Section A-A, Sheet M-2, shows exhaust out wall at floor and the <br /> outside air intake directly above et ceiling (6'-9" apart). <br /> U.B.C. should be checked. Ten feet is minimum required distance <br /> between supply and exhausts. <br /> 4. Yerify ihat ceiling gritle is adequate exhaust for two autoclaves. <br /> 5. Si:�� hot water supply and hot water return piping to the two � <br /> 7 � �.er heating coils. � <br /> STATE FIRE MARSHAL'S REVIEW � <br /> Pete Anderson 753-1296 � <br /> Submit fire alarm and sprinkler shop drawings for review. � <br /> ` LABORATORY CONSULTANT'S REYIEN ' <br /> Eleanor Pedlow 361-2812 I <br /> Eteanor Pedlow's commerts wi11 follow at a later date. <br /> In responding to the review, please answer each reviea item using our nunber- <br /> 1ng system. <br /> A set of stamped "approved S/2" (sub�ect ta) documents is being returned for <br /> use at tNe JoD s1te. These documents are to rematn on fite and avaSlable� <br /> in yood condition, for inspection et the �ob site at all times until th! <br /> proJect is completed and approved. It is recomnended that these documents <br /> be mede e permanent pnrt of the factllty records. <br /> Enclosed is one addressld post card. Please fill in the date, current pra <br /> fect cost, and return t6 this office when construction sterts. <br /> The completed new construction or remodel area shall not be occupted by <br /> pettents or staff until inspected by the State Fire Marshal and epproved by <br /> the Health Fecilities Survey Sectton and the State Fire Marshal. Please <br /> notify the Health Frcilities Survey Sectton, Metl Stop ET-31, Olympta, <br /> Mashington 98504, and Ted Curcto, Stete Fire Marshal's Office, Matl Stop <br /> ET-32, Olympia, Weshington 98504, r�t (206) 753-5848, Lhree weeks prior to <br /> the completion of the project. <br />