My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3326 PAINE AVE 2018-01-01 MF Import
>
Address Records
>
PAINE AVE
>
3326
>
3326 PAINE AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 7:43:58 AM
Creation date
2/25/2017 5:27:42 PM
Metadata
Fields
Template:
Address Document
Street Name
PAINE AVE
Street Number
3326
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: 12/16I2011 <br /> Public Works Permit#: PW1112-006 <br /> City of Everett Public Works Department puildinp Permil#; 81112-023 <br /> 3200 Cedar Street <br /> +: Everett, WA J8201 Planninq Reference#: <br /> (425)257-8810 <br /> Public Works Fee 5: � 1,269.36 <br /> Other 5: <br /> OW�:ER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> GLACIER PROPERTIES LLC <br /> 6333 KIEL COURT SE <br /> OLYMPIA WA 98503 <br /> PHONE: 3602800662 PHONE: <br /> TAX PARCEL ID# 00439079701700 SITE ADDRESS: 3326 PAINE AVE <br /> DESCRIPTION OF PROPOSED WORK: <br /> NEW COMM WAREHOUSE <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be pertormed in accordance with the permit and current Ciry of�verett Design and Conslruction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Construct per approved plan. <br /> H <br /> rti <br /> � <br /> � <br /> �'7 <br /> � <br /> � <br /> � <br /> � <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees lo hold and <br /> save hannless the City o(Everelt from any and all claims for <br /> damages,costs,expenses,or causes of action thal may arise <br /> beca se i Ilation and mainlenance ot the iinnrovement <br /> Q � �� or ot i �l-o � ay use frereto appliad for and furlher agrees <br /> to r no am pon nolice trom Ihe City and lo replace <br /> pp� d for ConsVucti Date publ pro rt d aged thereby. <br /> t <br /> FINAL INSPECTION Date <br /> Appfoved as ConstruCted Signalure o pplicanl Date <br /> VJORK AUTHORI2ED I:Y THIS P[Rh11T 14UST II[STAR7[D 1NITHIN 180 DAYS OF DATE PERPIIT IS ISSUED AND THEREAFITR IS TO BE DILIGENTLY <br /> PURSUED TO COFIPLETIOIJ. THIS P[f2141T h1AY 6[UNCEI.LFU 6Y THE CIIY UPON AWY STOPPAGE OF WORK ON THIS PRO]ECf OVER 90 DAYS DURAI"ION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.