My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3326 PAINE AVE 2018-01-01 MF Import
>
Address Records
>
PAINE AVE
>
3326
>
3326 PAINE AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 7:43:58 AM
Creation date
2/25/2017 5:27:42 PM
Metadata
Fields
Template:
Address Document
Street Name
PAINE AVE
Street Number
3326
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. INTRODUCTION <br /> This document is intended to provide the engineering information �ecessary to support <br /> the construction plan submittal to the City of [verett for this site. The site covers 0.72 <br /> acres. The area of disturbance for this project is focused along the north side of the <br /> parcel and includes approximately 11,500 sf of on-site and off-site improvements and <br /> disturbances. Therefore, the total disturbed area will be 0.26 acres. This project witl <br /> include some off-site paving within the Paine Ave R.O.W. to the east and alley to the <br /> west. In addition, the on-site improvements include pavement f�r parking and a loading <br /> dock.. <br /> This project proposes to create 0.24 acres of new impervious surfaces including roof, <br /> paricing and ramp for the loading dock. This will reyuire the construction of stormwater <br /> conveyance and detention facilities. Roof runoff from the new covered loading dock will <br /> be discharged onto the proposed pavement and collected in the parking lot collection <br /> system. Runoff from the loading ramp will be collected in a trench drain and connected <br /> directly to the combined stormisewer system as bypass. All of the proposed parking area <br /> as well as new roof area will be collected and conveyed to a detention pipe prior to <br /> release from the site. The site stormwater improvements were designed lo meet the <br /> COE 2010 Stormwater Management Manual along with the modifications to the <br /> standards contained in the interim Public Works Policy#2-11. <br /> l"he site is located west of Paine Ave at 3324 Paine Ave., in the City of Everett, and in <br /> S=ction 29, Township 29N, Range 5E, Willamette Meridian. See Figure 1 -Vicinity Map. <br /> 11-115 <br /> Glacier PropeAies page -4 <br /> December2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.