Laserfiche WebLink
5. MINIMIIM REQUIREMENTS <br /> MINIMUM REQUIREMENT#1: PREPARATION OF STORMWATER SITE PLANS <br /> This project proposes to construct new impervious surfaces in excess of the minimum <br /> lhreshold so a final stormwater site plan and report has been prepared with this submittal. <br /> MI' �IMUM REQUIREMENT#2: CONSTRUCTION STORMWATER POLLUTION <br /> PRtVENTION (SWPPP) <br /> 1: Mark Clearing Limits <br /> One of the first steps in the "Conslruction Sequence" included on the clearing and <br /> grading plan sheets is for a surveyor to stake the limits of clearing and to have <br /> construction flagging�fencing or silt fencing placed along the limits prior to any other <br /> constrtiction activity. <br /> 2: Establish Construction Access <br /> The SWPPP ca'�s for the proposed construction entrance to be installed as the second <br /> step after the stahfng of clearing limits. A detail is provided on the plans. <br /> 3: Control Flow Rates <br /> This project will retain as much existing vegetation as possible and lots will be re- <br /> �egetated after grading is complete. In addition, the detentior pipe will be used as <br /> sediment trap during construction. Therefore, the flow restrictors will be in place to <br /> regulate runoff during construction. This will protect the downstream system frorn higher <br /> flows during construction. <br /> 4: Install Sediment Controls <br /> This site and SWPPP proposes to construct a construction entrance and siit fenciny to <br /> collect and contain the uediment on this site. In addition, inlet filters v+ili be installed in the <br /> new catch basins on the site. These features are intended to minimize the opportunity for <br /> sediment to leave the site via stormwater or on vehicles. The construction of these <br /> features is one of the first items requir�d in the "Construction Sequence". Mulch wili also <br /> be used on the exposed soil as necessary to limit erosion. <br /> 5: Stabilize Soils <br /> The "Construciion Sequence" and "TESC Notes" call for the stabilization of soils that <br /> remain unworked tor certain lengths of time based on the time of year. Stabilization <br /> techniques may include but not limited to muiching, plastic sheeting or hydroseeding, <br /> notes have been auded to the plan regarding protection for the stock pile area if <br /> necessary. <br /> G: Protect Slopes <br /> All slopes on site during construction are required to be protected with mulch or other <br /> means as specified in the construction sequence. <br /> 7 Protect Drain Inlets <br /> l�II nrw catch ba;ins �n-ill have inlet fdters installed to protect ihe cor�veyance system. <br /> — -- ii-ii5 <br /> Glaaer Properties page-9 <br /> December2011 <br />