My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3326 PAINE AVE 2018-01-01 MF Import
>
Address Records
>
PAINE AVE
>
3326
>
3326 PAINE AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 7:43:58 AM
Creation date
2/25/2017 5:27:42 PM
Metadata
Fields
Template:
Address Document
Street Name
PAINE AVE
Street Number
3326
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINIMUM REQUIREMENT t�3: SOURCE CONTROL OF POLLUTANTS <br /> Since this project is located within the combined storm/sewer basin for the City of Everett, <br /> interim Public Works Policy#2-11 sta'.es that proje :ts within the combined basin are <br /> exempt from runoff treatment. <br /> MINIMUM REQUIREMENT 1i4: PRESERVATION OF NATURAL DR/�INAGE SYSTEMS <br /> AND OUTFALLS <br /> All of the runoff from the existing site is tributary to the combined storm/sewer system and <br /> that will remain the case after this project is completed. <br /> MINIMUM REQUIREMENT#5: ON-SITE STORMWATER MANAGEMENT <br /> Due to the developed nature of this existing parcel and the lack of any landscaping in this <br /> zone there is no area available for constructing on-site stormwater management BMPs. <br /> In addition, this site had previously contained a structure and has been graded the <br /> potential for infiltration in the Alderwood type soils is not a viable option. <br /> MINIMUM REQUIREMENT#6: RUNOFF TREATMENT <br /> Since this project is located within the comt::ed stortn/sewer basin for the City of Everett, <br /> interim Public Worics Policy #2-11 states that projects within the combined basin are <br /> exempt from runoff treatment. <br /> MINIMUM REQUIREMENT#7: FLOW CONTROL <br /> The design and analysis for this project requires the construction of 90 LF of detention <br /> pipe that have been sized using the VYWHM3 software. The pipe will discharge to the <br /> downstream system via 6" pipe oulfalis to the sewer main in Paine Ave. <br /> MINIMUM FEQUIREMENT#B: WETLAND PROTECTION <br /> No wetlands exist in the downstream system for this project. <br /> MINIMUM REQUIREMENT#9: BASIIvNVATERSHED PLANNING <br /> No existing Basin or Watershed plans were found that affect the area around this proiect. <br /> --- 1t-1t5 <br /> Glacier PropeAies page-11 <br /> December2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.