My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3326 PAINE AVE 2018-01-01 MF Import
>
Address Records
>
PAINE AVE
>
3326
>
3326 PAINE AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 7:43:58 AM
Creation date
2/25/2017 5:27:42 PM
Metadata
Fields
Template:
Address Document
Street Name
PAINE AVE
Street Number
3326
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Steve Miller � l �(Z�G�-3 <br /> Ton Lee <br /> S nrt� Wedneaday, July 11, 2012 12:28 FM <br /> To: Stee^Miller; Andy Hall <br /> Subject: RE: Bargreen Warehouse -2 hcur wall on the west side of the building <br /> Steve and Andy—I thmk part of the problem we are having iz that we have had several conver;ations ovcr!ime on this <br /> buiiding. While we were having those conversations, the scope o`. the project and the physical conditiun of the building <br /> has changed. When we began, the discussions revolved around only fixing the fire damage area (which was a relatively <br /> smali area based on our discussions) buc leaving the remainder of the building ir�tact. The thought process then was the <br /> typical "don't touch it,don't have to update i�". At some point, the buildin�was completely removed except for steel <br /> structure. This was not part of previous discussions. There is really nothin� substantial left for us to 'grandfather'. <br /> Based on our long standing philosophy already :nentionrd, now that the strudure ha� been reiT:oved, whai is built will <br /> have to comply vai�h current c�des. Sorry for any con(usion. <br /> Thanks, lony <br /> From: Steve Miller <br /> Sent: Wednesday, )i ly 11, 2012 11:32 AM <br /> To: Tony Lee <br /> Subjed: FW: Bargreen Warehouse - 2 hour wall on the west side of the building <br /> From: Andy Hall [mailto:andy��_b_nharch,co_m] <br /> 5ent: Wednesday, Juiy il, 2012 11:30 AM <br /> To: Steve Miller <br /> Ce: Miles Walke, <br /> Su�jeet: t3argrcen Warehouse - 2 hour tvall on thc we;t side o(the building <br /> Steve� <br /> I don't hsve any rer,ord oi a reyuirement to install a two hour wall a!ong the west side of+he bumed out Bargreen <br /> warehouse but I thought 1 remembered discussing lhe two hour wall with Tony (months agu) and that we wouldn't have to <br /> provide that because the building was grandfathered in and tha!the Bargreen's were making repairs to their burned down <br /> building. We�Iso are now sprinklering the building when it hadn't been sprinklered before. <br /> If we are required to do a two hour wall it will be very difficult to do on a typical metal building frame, as is proposed to go <br /> back in and is what the insurance company will pay for. <br /> P!ease consider dropping this requirement for a two hour wall on the west >ide of tl�e buddina as ,t wasn t their before the <br /> fire and we are adually upgrading b, having fire sprinklers <br /> Thanksl <br /> Andrew tv� Hali AIA <br /> Preside•,t <br /> Botesch, Nash 8 Hall <br /> � � �. .. .�.P� <br /> �72%OaYes Aver{d2 Sude 1 U� <br /> 1 <br />� <br /> ,r`3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.