Laserfiche WebLink
Steve Miller � �� �2^GZ� — <br /> From: Steve Miller <br /> Sent: Friday, July 13, 2012 3:33 PM <br /> To: 'Miles Walker <br /> Cc: Andy Hall;jim@gaffneyconstruction.com;joe@gaffneyconstruction.com; Tony L:e <br /> Subject: RE: Glacier Properties Warehouse-Structural Requirements <br /> 7he mnstruction doaments that have Ueen submitted indude structurel engineering for the new loading dock only. <br /> Please provide the structural engineering for the rest.This should include sizing and connection detailing for all purlins, <br /> girts, roof deck.siding, etc.and be stamped by an engineer licensed in the state of Wa.The existing moment frames can <br /> be considered "grandfathered". <br /> From: Miles Walker [mailto•milesCa�bnharch.com] <br /> Sent: Friday, ]uly 13, 2012 3:15 PM <br /> To: Steve Miller <br /> Cc: Andy Hall; tim(a�qaffnevconstrudion com; ioe(aaaffne�onstrudion.com <br /> Subject: Glacier Properties Warehouse - Structural Requirements <br /> Steve, <br /> Could you please provide a written des•�ription as far as what you need for the structural requirements for the metal <br /> panel steel support structure?Tliank you. <br /> -Miles. <br /> Miles Walker <br /> Associate <br /> �8oteseh,Nash& Hall <br /> Arthitecis.P.S. <br /> 2727 Oakes Avenue,Suile 100 <br /> Everett,WA 98207 <br /> 425�259-0868 <br /> m�les�bnhnrch cim <br /> �:w,v bnharch co�n <br /> I <br /> 1 <br />