Laserfiche WebLink
� r � <br /> � <br /> ay <br /> mzm <br /> C M <br /> 9 H cn <br /> Y <br /> y N <br /> fC C] <br /> H 77 <br /> Ox0 <br /> '�] H "i1 � <br /> �' �"� ' INFORMATION FOR DEVELOPER: <br /> �io � <br /> H C1 <br /> ia. Detailed drawings in accordance with City Design and <br /> H m g Construction Standards shall be submitted to the Public <br /> z N C Works Department showing site parking layout, landscaping, <br /> y �C utilities, storm drainage, temporary construction erosion <br /> control, and all required improvements in the public <br /> gy H � right-of-way. Public Works Department approval of these <br /> � b�, '1 drawings is required prior to any permits being issued. All <br /> improvements shall be completed, approve d, an d warrante d <br /> �� � before the Occupancy Permit is issued. <br /> zyw <br /> HOtn . <br /> b. City streets and alleys are to be kept clear of dirt and <br /> debris at all times during construction. Dust suppression <br /> and street cleaning must occur as directed b� the Public <br /> Works Inspector. The Washington State Clean Air Act requires <br /> the use of all known, available, and reasonable means of <br /> controlling air pollution, including dust. Dust generated <br /> during constructior. activities can be controlled by wetting <br /> - those dust sources such as areas of exposed soils, washing <br /> - truck wheels before they leave the site, and installing and <br /> maintaining gravel construction entrances. Construction <br /> + vehicle track-out is also a major dust source. Any evidence <br /> � of track-out can trigger violations and fines from the <br /> Department of Ecology or the Puget Sound Air Pollution <br /> '�' : Control Agency. <br /> t c. Performance guarantees are required for street, alley, and <br /> ��' utility improvements. <br /> d 1 d. A one-year guar:.ntee is required on the public improvements <br /> � � : and a two-year guarantee on required landscaping for an <br /> � ; amount not less than 10� of the cost of construction and <br /> � shall run for one year from the date of issuance of the first <br /> � � Occupancy Permit. <br /> � � <br /> e. As-builts of storm sewer, sanitary sewer, and water systems <br /> �' will be required to be submitted per City design and <br /> ' construction standards and speci£ication. <br /> f. Any grading or filling on this site shall be done so that the <br /> �� surrounding properties will not be impacted. <br /> �� 2a. All required access roads and fire hydrants must be in <br /> service prior to commencement of construction. <br /> t' b. The City of Everatt prohibits outdoor burning. Therefora, no <br /> 1 fires for the purpose of disposing of construction debris <br /> will be allowed. <br /> c. Display the correct address legibly over or near the main <br /> entrance to the building. <br /> 4 <br />