Laserfiche WebLink
everett INSPECTION REPORT <br /> eAddress I �l1 ` ��� l:L� <br /> Contractor �����f!ll'��� �lC�. <br /> Owner ��'��'� ti�l��r�� _ <br /> Date ��"� �� <br /> TYPE OF INSPECTION REQUESTED <br /> L� BLDG: Pmt. No. ❑ MECH: Pml. No. <br /> �LEC: Pmt. No. ���� ❑ PLBG: Pmt. No. <br /> ❑Temp.Elect. ❑ Framing ❑ Gas Piping <br /> ❑ Footing ❑ Drywall, Nailing ❑ Consultation <br /> ❑ Foundation ❑Shear Nailing ❑Groundwork <br /> ❑ Ductwork ❑Grid ❑Struct.Slab <br /> ❑Wood Stove ❑ Rough•In —$Final <br /> ❑ Masonry ❑Service ❑ <br /> �PROVAL ❑ PARTIAL APPROVAL <br /> ❑ VIOLATION ❑ CORRECTION REQUIRED <br /> ❑ Correclions listed below MUST BE MADE betore work can be approved. <br /> O Please contact inspector and arrange for appointment. <br /> O Was not able to perform inspection. <br /> � CALL 259-BB10 FOR REINSPECTION— 24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY St,ALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> > <br /> Inspector � ���� <br />