Laserfiche WebLink
; . - .. . _ _ ��r ����. <br /> /� � <br /> � . � 4�L5'f�T[0 C'`� <br /> O '\ <br /> � U <br /> � 1i <br /> �h , 0 . <br /> 1 V A�' <br /> STATE OF WASHINGTON <br /> DEPARTMENT OF ECOLOGY � <br /> Northwest Negional CNice, 3190 - 160th Ave S.E • Belfewe, Wuhingfon 98008-5452 • (T06) 649-7000 � <br /> November 3, 1994 ��-�' " - '' � '" � '�� <br /> - . ._ ... .. _ .� � ! �� <br /> _ ` +- ` <br /> \::'Sr � .?, �4�C3 .�./ <br /> Mr. Dave Davis <br /> ......._...................................................._ <br /> City of Everett Ci i 1' 0� =�!Y P,_T i <br /> Public Works Department o;_�... �;��..�;; Dept. <br /> 3200 Cedaz Street + <br /> Everett, Wathington 98201-4599 <br /> Re: Building Permits on Everett Smelter Site <br /> Dear Mr. Davis: <br /> As we discussed last T:�ursday night, construction projecu aze being conducted on the smelter site, <br /> some of which may include the disturbanc�, and movement of lazge amounu of soil. Soil at these <br /> construction projects may contain elevated concentrations of azsenic. Excavation ofthis soil could <br /> cesult in the generation of state dangerous wute. In an effort to minimize the chance that soil, <br /> potentially classified as dangerous waste, is handled and transported improperly, I am requesting that <br /> the City include a condition on any building permit for constrvction projects conducted on the Everett <br /> Smelter site (see attached map). Any consUuction projects that will require the movement or <br /> disturbance of soil should contain ihe following condition: <br /> Representative soil samples must be collected and analyzed for total usenic content. Only <br /> soil that will be disturbed should be sampled. The aumber of samples necessary will depend <br /> on the amount of soil that will be disturbed. Soil samples should be coller�ed-and analyzed in <br /> � accordance with standazd environmental laboratory procedures. Results of the analysis must <br /> e reporc to e City of Everett Public Works Dep�utment and the Deoartrnent of Ecolo <br /> Tozia Cleanup Program, Northwest Regional Offic�e Any excavated soil s6a11 be hand e['a J'9 <br /> and dispos ance'wtdi'atty'�1iL'2btSTaws or regulations (eg. soii classified as S'� '�,p <br /> dangerous wazte shall be handlecl and d•.sposed of in accordance witlt Chapter 17 3-3 0 3 W A C,o'o�o�,�� <br /> the Dangerous Waste Regulations). In addition, adequate precautions must be taken to insure,o� o <br /> that any disrurbed soil daes not�>ose a potential threat to human health and the environment �.oe^xs <br /> during or after the construction project. Compliance with this condition does not alter the 9�c j s <br /> persoa's obligatiun to comply with all other applicable laws or regulations. `y <br /> In addition to the above condition, I recommend that a copy of the Snohomish Health District's Public <br /> Healty•Advisory be attached to any building permit issued for projects within the smeiter site study <br /> azea. - <br /> Per your request, I have included a msp showing the general azea where any building permits should ' � <br /> contain this condition. I have also inciuded a list of environmental laboratories'where soil samples <br /> could be analyzed. This list is only i��duded u a starting point for anyone interested in having soil <br /> .,�;e. �0 <br />