Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENT� <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> y � Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouls to the side sewer. <br /> �:,�lnect roo�wnsp— outs-te h�r�inage s em provided for this lot. <br /> � Rooftop runoff must be discharged to a roof downspout infiltratian system per City of Everett <br /> Storm Manual 3-2.6.2. �^ ^�nrnxi ^t �^ �•��-� � , �• , e <br /> . .Se� �Cqn �o� S��i.� . <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Public Works inspector, such �s silt <br /> fence, straw bales, swales, or erosion blankets. <br /> (�. Install erosion control measures per City of Everett Standards tor smali parcels <br /> 13. Remove erosion control measures upon completion of the project prior to final approval of tlie <br /> permit. <br /> (ld All excavated malerial from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of malerial is allowed on this building lot. <br /> 15. Remove and replace curb, yutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on lhis proposal's frontaye as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 1G. Install a Type I concrete driveway per City of Everett Slandard #307. <br /> � <br /> '17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the_ Water Oistrict for connecting provisions for this bu�iding'� <br /> waler and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #l410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. � <br /> f�21� A sprinkler system is re�;uired for this building in compliance with the requirements of NFDA <br /> � Standardsl3D.. �� �-- � i .r-.:..7'. ,�< ,-</ d:l�. <br /> � � �,.0 �. . .l , �;�. <br /> ��'._.— 7/G:..,r1'i��.it ��'�'. �rc'�'f. rt �.tl�� c/� �-r!<'�; . , ��.j'� �� r. . <br /> .�•,4 l,�' - °,j ` 1�•� � � <br /> \ � L.c��.4.-u.�L4�• . �01— �'u- L ' f� � �' . <br /> PWCommenQ �/ � � �� , , <br /> �, -, <br /> -, /,. ��" � '' ��. � uJI�..�_��p' GU• �- . <br /> �Q _ - ��-�i;� `t _(�vL�e.(..%�L�/ LL�C�G+C.- i_ ��. ._ �. ' L..i d �i�: ✓i ,. .. �A <br /> � - : � . / <br /> _ � � . �' � . . (� ..1 � C <br /> // -- / . ., , , . . � . . ;, . ;� . . , . , /�_ k>o�/c f�� L..: de.,c p¢�� a �����c l <br /> � n dn�{4d � 3-�' F ��PY4�c�r�/ <br />