Laserfiche WebLink
INSPECTION REPORT <br /> �Address —�� �O ��a,a. /��� <br /> Contractor wC_�_arLL�T��YtP�_ <br /> Owner Ln l�rt r <br /> � Date _l�_1_� —9/� <br /> PPROVAL U PARTIAL APPROVAL <br /> J VIOLATION U CORRECTION REQUESTED <br /> J Correctiors listed below MUST BE MADE belore work can be approved. <br /> J Please contact inspedor and arrange lor appoiniment. <br /> �Was not able to perform inspection. <br /> J CALL 25g_gB10 FOR REINSPECTIOF!–24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES Pp10R TO JCCUPANCY. <br /> , <br /> � --- <br /> v — <br /> Inspecror / � _ �_Date / <br /> YPE OF INSPECTION REOUESTED <br /> J Temp. Elect. J Framing J Gas Pi�ing <br /> 'y Fuotmg J Drywall,Naiiing J Consultation <br /> J�Foundation J Shear Nailing J Groundwork <br /> J Duciwork J Grid J Siruct. Slab <br /> J Wood Slove J Rough-in J Final <br /> J Masonry J Service J Insulati�n <br /> J Other _ <br /> .�{.DG: Pmt. No. �5��_J MECH: Pmt. No.___ <br /> J ELEC� Pmt. No...—_--—____J PLBG� Pmt. No.__________. <br />