Laserfiche WebLink
�- <br /> 9. �1ny grading/fill on this sice shall be done so as to no[ ir�pac[ the <br /> surrounding properties. <br /> 10. Dedication of ten (10) feet of right-of-Way on Upper Ridge Road ia <br /> req�ired before final approval. <br /> 11. A Local Improvement District covenant for Upper Ridge Road is <br /> required before final approval. <br /> 12. The sewer main must be extended acrosa the full frontage in Meridian <br /> Avenue per City Design Standards. <br /> 13. The Nater main in 1leridian Avenue must be extended acroas the full <br /> frontage per City Design Standards. <br /> � ��C 14. 4ddresses must be provided at the street entry for all lots served by <br /> the easement access road. <br /> G x <br /> � H t~i� 15. Address must be provided on each single family dwelling so as to be <br /> ,.� � clearly vlsible from easement access road. Note on the Einal plat <br /> K�n map. <br /> H�1 <br /> �H� 16. Signa stating "ti0 PARKING FIRE LANE" must be provided for the leng[h <br /> y �"� of the easement access road. Locatfona of signs must be approved by <br /> � �p� the Fire Marslial. <br /> HC <br /> 17. A fire hydrunt capable of providfng the required fire flow muet be <br /> p�� lnetalled xithin 350 driving feet of all resldences. <br /> yH <br /> t"M� INFORMATION FOR DEVELOPER: <br /> � y <br /> �v 1. Mlnimum Pire flov for single family dwellSnge is 1,000 GPM, the fire <br /> � r flox may be higher depending upon aize of dwelling. A tecen[ flor+ <br /> y nl teat indicates that [here is an avallable flre flox of 1,450 GPM. <br /> O y Th7s flow would limit structule sizea to 3,000 square feet without <br /> any additional fiLe pro[ectfon. <br /> � 2. City streets are to be kept clear of dirt ��d debrfs at all tfinea <br /> during canetruction. Dust suQpression end at ':t cleaning muet occur <br /> i as directed by the Public Idorks Inepec[or. <br /> IC� 3. A one year guaran[ee �s requlied on the publlc improvements for an <br /> � amount not lese [han lOX of [he coat of construc[ion and ehall run <br /> for one year from the date of final approval . <br /> I �_ 4. As-builts of storm sewer, sanitary sewer, and water systeme will be <br /> , aubmitted per City Deslgn and Conetr�ctlon Standarde and <br /> Specificatfona. <br /> �I �� FINAL APPNOVAL OF THIS Sf{ORT SUBDIVISION shall be given sub�ect [o the <br /> eatisfactory completion of the above specified requiremente and <br /> improvemente, one (1) year for a short subdivisfon where there are no publ7c <br /> `1�1 Smprovements, [hree (3) yeare ahere public improvements are required. <br /> NOTE: There are no time exteneione for ahort subd�vlslons. <br /> � <br /> - 4 - <br />