My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1401 MERRILL CREEK PKY 2016-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
1401
>
1401 MERRILL CREEK PKY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2017 9:09:23 AM
Creation date
2/25/2017 8:46:22 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1401
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/12/08 11:J1 FAE . ���Z <br /> _.�— <br /> GEOENGINEEHS� <br /> July 1Z,2006 <br /> FF Development L.P. <br /> 19401 40°i Avenuc W.,Suitc 280 <br /> Lynmrood,a'uhin8ton 98036 <br /> Subju:� Summary Lette[ � \ <br /> Geotechnical Conswction Observation—Building Nos.2 a 19 <br /> 'il�e Millington Q Mertm�l Cteek <br /> Evecett,Washingmn <br /> GEI File No. 7630-004-03 <br /> INTRODUCTION <br /> Tb' pros u a summary of our geotechnical construccion observation scrvices for Huildiag Nos.2 <br /> l9 of Th �MiUington at Merrill Crak located in Everett+ W�s�'gton. Building No. 19 is aiso <br /> refert the Club House building. <br /> Wc heve provided geotechnical conshuction obsecvation savices for the ��s proj� but only the <br /> eonstruction observacions completed for Building Nos. 2 and 19 are pcesented �n �1+�5 ��*• WO `�'i�� <br /> provide e separate letter that wili summeriu ow coashvction observgtions completed for the otha <br /> buildings and arees ofthe project. <br /> 'il�e �eotechnical aspects essociated with construccion of Building Nos. 2 and 19 included soil benritig <br /> verifieaeion,structural fill matcrial characteristics.Plecem�°t and compution verification• <br /> SUMMARY <br /> Basei on our observatioes, it is our op��on thnt the wnstn�ction aetiv�bes at Building Nos. 2 aad l9 <br /> abserved by GeoEngineen wera completed in gencrnl accordanee wndi our �mmendations, and the <br /> project plans and specifications. <br /> 09SERVATIONS <br /> We visitect die site on n full time basi�on 25 occesions bataiew June 23 and July 20, 2405 (refer to 6eld <br /> report Nos. 1 through 25)during tLe mass grading periad to evalueu com�tc6on of tbe Eill placed within <br /> the Fod I e+ea where Building Nos. 2 nnd 19 are located. We also campleitd intetmitt�nt eite visits on <br /> 12 occasions between September 12 and Septernber 27,2005 (refa to field repart Nos.61 thtongh 72)to <br /> evaluete the slab and footing subgrade soils within Building Nos, 2 and 19. Detnils of our siu visits, <br /> including our obsetvations and recommendations aze p�xnrod ia our dai�Y f eld reports refecsed above. <br /> A complew set oY£cld reports has been provided to you during aonswctiun and also hes ban fmwatded <br /> to the on-site FF Developmerrt.Construation oHia- <br /> FILL MATERIAL EVALUA7lON AND R�QUIRED COMPACTION <br /> On-site soils were used as fill and baekfill at the site. We evaluated fill placement ncdvities within the <br /> Pod 1 erea whetc Building Nos. 2 and 19 ve located dwing the mass IfradinB period on 25 occasions <br /> between Junc 23 and July 20,2005(refer to field report Nos. I tivough 25). <br /> �. .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.