My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1808 MERRILL CREEK PKY 2016-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
1808
>
1808 MERRILL CREEK PKY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2017 9:17:22 PM
Creation date
2/25/2017 9:16:29 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1808
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> ,;�f `hqQ� p�J� w A <br /> `: ��,`�g 'r Ir <br /> � <br /> �'�Ierrill Creek Centre <br /> 3240 Fasdake Avenue Fast N201,Sea[de,WA 98102(206)322-9111 <br /> May 13. 1991 <br /> Mr. Dan Mathias <br /> Public Works Department <br /> Citv ofi Everett 3200 Cedar St. <br /> Everett, WA 98201 <br /> Re: Storm retention. Overall Lau�dry site <br /> Dear Mr. Mathias: <br /> Thank you for Vour recent time and effort with regard toward <br /> expa�sion of the storm water retention reservoir at the <br /> cor;:3r of Hardeson Road and Merrill Creek Parkway and at the <br /> north end ot Merrill Creek Associates' property. <br /> From mY discussions with Mike Pawlack ofi Entranco <br /> Engineering, it appears that Dam Safety as well as your <br /> offiices �re in accord as to the viability of this expansion. <br /> It appears that both Merrill Creek Associates and the Citv <br /> ofi Everett will benefit firom this project. I would like to <br /> schedule a meetin9 with you to discuss construction <br /> scheduling, and dele9ation of responsibilities and costs. <br /> Also; with the above in mind, please give Overall Laundry <br /> enough storm retention in the existing 5.2 acre feet to <br /> cover their storm re`ention needs. I am lettirig their <br /> representatives kno • that they will be yiven the capacity in <br /> that 5.2 acre fee� to meet their �eeds, and that therefiore, <br /> no on site storm retention will be required. Please nermit <br /> this information with regard to anv SEPA of building p <br /> applications presented by Overall �aundry- <br /> Thanks again' fior your continued cooperation in this matter. <br /> Should you have further comment, please give me a call . I <br /> look forward to finalizing details with you soon. <br /> Sincerely, <br /> MERRILL C EK ASSOCIATES <br /> i-•.., ;�/� <br /> � '' E <br /> Jefif�-ey S.Rhodes <br /> General 'Partner <br /> cc: Mike Pawlack/Entranco Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.