Laserfiche WebLink
DETENTION PIPE �" <br /> Because of the small size of the tributa.ry drainage basin, the detention pipe was not sized <br /> according to the SWMM model. Instead, the SBUH method was used to determine the <br /> allowable release rates and the required volume. The detention pipe was sized to <br /> attenuate the 25-year developed flows to the 5-year pre-developed flo�vs. The control <br /> structure consists of a 12-inch standpipe with ttivo orifices sized for the two design storm <br /> events. The standpipe also acts as an overflow riser to release storms greater than the 25- <br /> year event. <br /> Release Rates (Existine Cm�ditio�il <br /> There is approximately 1.60 acres tributary to the proposed detention pipe. Although this <br /> area has been cleared, the existing condition lias been modeled in its once forested <br /> condition (CN = Sl). The esisting condition hydrographs are as follows: <br /> TOTAL AREA: I.GO Acres BASGFLOWS: 0.00 cfs <br /> ItAINFALL TYPE: Type IA TIME INTERVAL: 10.00 min <br /> TIME OF CONC: 30.13 min AI3STRACT. COLP'F: 020 <br /> PERVIOUS AREA [MPERVIOUS AREA <br /> AREA: 1.60 Acres AREA: 0.00 Acres <br /> CN: 81.00 CN: 95.00 <br /> T�Reacii - Slieet Fiow: L: 100 feet n,: 0.4000 p2yr: I.55 s: 0.0490 ft/ft <br /> T� Reach - Shal. Cona Flo�v: L: 575 feet k,: 5.00 s: 0.0500 ft/ft <br /> HYDROGRAPH SUMMARY <br /> Starm Precip. Peak Flow Volume Time of Peak <br /> in CPS Ao-fi min <br /> 2-Year 1.55 0.04 0.05 540 <br /> 5-Year 1.93 OA9 0.07 490 <br /> 10-Year 2.23 0.14 0.10 490 <br /> 25-Year 2.63 0.22 0.14 490 <br /> 100-Ye�r 3.21 0.34 0.20 490 <br /> STORM DRAINAGE RGI'ORT FOR IN7'ItAWLS'1'-SF.A\VAl' - PAGE IS <br />