Laserfiche WebLink
�� <br /> October 24, 1995 � �' '�� . . <br /> TRIAD ASSOCIATE <br /> Mr. Gordon Witcher ,,,�,��,,,,,,,,�m�,,, �� t <br /> Ciry of Everett Public Works �, ,���,,,,���,,,,,, �' � ;�, <br /> 3200 Cedar Street ,:,,,,, s�,�oY,�� � F�;� ;� �Q <br /> Everett,WA 98201 �,,,,�,u„o,,,,��,,,�.,, ;� a <br /> � t� <br /> Landsc:�Vc Arch�i<�4J:� C\j ,+�C/ � <br /> RE: Intracorp -Merrill Creek&Hurdeson Road Sites r ;c,, �o <br /> Sde f�esigiM. �.) '� <br /> Triad Job Number 95-225 �; � � <br /> C � 4� <br /> Dear Gordon; <br /> Attached for you, Jane Zimmerman and Dan Mathia are copies of preliminary site plans, boundary <br /> & topographic surveys and site development information for two commercial projects proposed <br /> by Intracorp. Site #1, "Merrill Creek", is located on the west side of Hardeson Road, south of <br /> Merrill Creek Parkway. This site lies within the inactive quarry below Intracorp's proposed <br /> "Seaway" project. Site #2, "Hardeson Road", is located on the east side of Hardeson Road, <br /> across the street from the proposed "Merrill Creek" site. Both projects are in the planning stage <br /> and are ready for preliminary engineering analysis. It is assumed detention and/or water quality <br /> facilities will be required for both sites. We understand detention (some or all) may already be <br /> provided within the city's regional detention system just north of the Merrill Creek site. It is <br /> impoRant that we know how much of this detention is available and what we have to do to access <br /> it. We are providing the following preliminary site development statistics so that Jane and Dan <br /> can determine the required detention volumes and release rates for both projects. lf additional <br /> information is required, please call. <br /> Site#1 -Merrill Creek <br /> This site consists of several parcels, totaling 29.81 acres. The attached boundary & topographic <br /> survey indicates significant relief as the result of recent quarry operations. The westem property <br /> is bounded by the revegetated quarry slope. The central portion of the property is occupied by a <br /> large sedimentation control facility. Most of the remaining flat site is graded to drain towards this <br /> facility. It is obvious the quarry activities have altered "pre-developed" conditions. For pre- <br /> developed conditions, I have provided a 1" = 1000' copy of the quadrangle maps for this area. <br /> Even though quarry activity is indicated on these maNs, the topographic relief appears to be <br /> relatively undisturbed. Based upon the quadrangle maps, I have estimated the following pre- <br /> developed conditions: <br /> Area: 29.81 Acres <br /> Ground Cover: Dense Trees and Underbiush, CN = 76 (Aldernood Gravelly Sandy Loam <br /> and Tokul Gravelly Loam, Soils Group C) <br /> Time of Concentration: <br /> 300' of 32.00% Sheet Flow throush forested underbrush, n= 0.60 and Tc= 34.46 Min <br /> 1,600' of 1.70% Channel Flow through forested ravine, Kc= 10.0 and Tc=20.45 Min <br /> Total Tc= 54.91 Min <br /> '.t;�:. i :..•i;�.� �.-.. I. i �..',,:�.d r ,.Y,�.�.,.�i903A.6n.^3 Phonc :'rn..,�., �.,�..:��, ToIIFrc � <br /> ,.•.r�i�� �, Fnx -:��� � .i.:6�. <br />