Laserfiche WebLink
., <br /> �, . <br /> E-3592-810 <br /> Omnlplan Pafle 3 <br /> I '`. July 9, 1996 <br /> Subsurfaca <br /> The site was previously a borrow pit. 7he soils exposed ac the hase of the site and in the <br /> pit excavation slopes on the west side of the site generally consist of inediurn dense siity <br /> sand with gravel (SM1. The site is currently being filled. The source material consists <br /> of silty sand with gravel from the Seaway Tract 1 daveloprnent to the west and tha <br /> Seaway Tract 3 duvolopment east of Hardeson Road. Thls soil also primarily consists of <br /> silty sand wlch gravel (SM), <br /> C►�ndwater <br /> There are no inclicati�ns of grourdwater seepa�e at the site. As site grados will be raised <br /> thirty (30) to forty (h0) fest, we do not anticipate grounc�water wili result In any major <br /> construction related issues. Howover, the contractor should bo made aware that <br /> flroundwater conditions can cha��Aectuatehdapending ontthe se•isone amount o1f ainfall, <br /> ralse site grades. Seepage may <br /> t <br /> rate Is greater in the/w t erhwintertmonths (typlcallly Octoberl tf�roughlMay)�n� see�age <br /> � �S�'���� �ND REGOMMENDATIOIVS , <br /> 8a�s d on ;he results of our studYsu� �o°C��P�e��ov ded usl�ng a conver�po e9sp ead and <br /> planned, In our opinion, building pP <br /> continuous f���Nng foundation systam supported on the structural flll used bersimilarly <br /> grades to construction su�grade slevations. Slab-on-grade floors may <br /> supparted. <br /> We estimate settlement of the fill �sed to achleve construction subgrade elevations will <br /> be on the order of one inch, This would be in addition to the one-half to one inch of <br /> settlerne��t which wlll be indur,ed by the buildinc� structural loads, If this amount of <br /> settlemont cannot ba tolerated, then the fill used to raise sito grades should be allowed <br /> to "settle out" with the settlement monitored with a scries of monitoring points. These <br /> polnts are in place and currently being monitored as the fiil is baing placed. When the <br /> settlement ceases, or is withln tolerable Iimits, bullding constructlon can commence. <br /> E�h Ceneultenl�, ��c. <br />