My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1808 MERRILL CREEK PKY 2016-01-01 MF Import
>
Address Records
>
MERRILL CREEK PKY
>
1808
>
1808 MERRILL CREEK PKY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2017 9:17:22 PM
Creation date
2/25/2017 9:16:29 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
1808
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ � • <br /> ..' <br /> -- Omniplan �-3592-610 <br /> � ' ' July 9, 1998 Page 11 <br /> LIMITATIONS <br /> Our recommendations and conclusions are based on tho site materials observed, solective <br /> laboratory testinc� ancl engineering analyses, the design Information provided us and our <br /> experience and enc�ineering judgment, The conclusions and recommendations are <br /> professionai opinions derived In a manner r,onsistent with that level of care and skill <br /> , ordinarily exercised by othar members of the profession currentiy practicing und�r similar <br /> conditions in this area. No ovarranty is expressed or implied. <br /> The recommendations submitted in this report are Based upon the soil conditions observad <br /> at the site and our construction monitorin�. Soil and groundwater conditions between <br /> may vary from those observed, The nature anJ e:ctent of may not become evident until <br /> construction. If variations do appear, ECI should be requested to reevaluate the <br /> recommendations o f chis report and to modiFy or verify them in writing prior to proceeding <br /> with tha construction. <br /> Ad�tional Services <br /> As the geotechnical eng(neer of record, ECI should be retained to perform a ganeral roview <br /> of the final desic�n and specifications to verify that the eartfiwork and foundation <br /> recommendations have been properly Interpreted and implemented in the design and in <br /> tho construction specifications. . <br /> ECI should also be retained to provide geotechnical services during construction. 7his is <br /> to observe compliance with the desic�n concepts, specifications or recommendations and <br /> to ailow dasign changes in th� event subsurface conditions differ from those anticipated <br /> prior to the start of r,onstruction. We do not accept responsibility for the performance <br /> of the foundation or�arthwork unless we are retalned to review the construc;lon drawings <br /> and speclflcations, and to provlde construction oBservation and testing services. <br /> E�rth Cao+uhmit�, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.