Laserfiche WebLink
. . - • <br /> 199i lVas�inpron Stete NomesiEenOal Ene�gy CoCe CcmF'-ance Fo�ms _une.1?95 <br /> Projert Info P�ojectAddress 1910 Nerxill c:eet eut..,y Dale 1/15/04 <br /> Cvezett, WasAington 9B00� For Building�epartment Use <br /> Applicant Name: Ai,,,i�y u�nic«<��e attn: Mlclwel G. Aimley 7 U�{d� _ �J L3 <br /> ApplicanlAddress: iso aoy scio�� s�>cno, WA 9B109 <br /> Applicant Phone: �zas� M1-1329 <br /> Project Description —�1� New Building ❑Addition ❑ Alteralion ❑Change ol Use —� <br /> Q Prescriplive � Component Per(ormance �ENVSTD �Systems <br /> Compliance Option (See Oecisioc Flowchart(over)for qualiGcations) Analysis <br /> Space Heat 1'ype Q Eleclric resistance Q All other (see over for defniticns) <br /> Total Glazing Area Eleclronic versien: lhese values are automatically taken from ENV•UA4. <br /> Ci�82lI1�f11'l'BC�tI'll�d�lOil (roughopening) GrossEMerior <br /> No1o:Belrnv pr.�da�v�us m:ry ho induded in the (vetlical 8 overhd) divided by Wall Area limes 100 equals 'b Glazing <br /> G�ossErlc�iorWnllArcaillheyaroinsulated�o 1305 . 0 — 20823.0 X100 = 6 .3� <br /> Iho lovel roquireA lai op:•que vr.Jls. <br /> � yes Check hero il usiny this optian and il pmjecl meels all mquimments lor Ihe ConcreteMasonry <br /> ConerMe/��fason 0 �1017 Oplion. Sea Decision Flwxhatl(aveQ Ior qualifcations. Enler requitements for cazh quafitying <br /> /" ry P � no assemhly bolwi. <br /> Envelupe Requirements(enter values as?pplicable) Opaque Concrete/Masonry Wall fiequirements <br /> Fldly heafed/cooled spaco Insulation on interior-maximum U-factor is 0.19 <br /> M�nimum Insulafion R•values :nsulation on ederior or integral-maximum U-factor is 025 <br /> Roofs Over Atlic R-25 If pmiect quali�es for Conerete/Masenry Option,lisl walls <br /> with HC 3 9.0 BIWR�°F 6elow(other walls musl meet <br /> All Olher Reofs Opaque Wall requirement;). Use descnplions and values <br /> Opaque Walls A-19 from Table 20-Sb in ihe�:ode. <br /> 9elow Grade Walls Wall Description U-factor <br /> Floors Over Unconditioned Space (induding insulation R-value 3 position) <br /> Slabs-on-Grade R-10 <br /> Radiant Floors <br /> Maximum U-/aclors <br /> Opaque Doors 0.600 <br /> Vettical Glazing Q.600 <br /> Overhead Glazing 1.300 <br /> Maximum SHGC(or SC) <br /> VetlicallOverhead Glazing 0.700 <br /> Semi-heated space• <br /> Minimum Insulation R-values <br /> Roofs Over Semi-Healed Spaces' a-19 <br /> 'Refer lo Section 13f 01or quaGficalions and requiremenls <br /> Notes: The Intec Building is a facility for the testing of materials and manufacturing of <br /> miscellaneous products. This phase includes the construction of the shell and all of the <br /> interior improvements. The office area is fully heated/cooled space but the <br /> manufaciuring / storage area is semi-heated space.. j� <br /> ��1� <br />